none, Import soil to fill fissures, Application•
Addresses)
EXPORT/IMPORT OF SOIL FOR EROSION CONTROL
A PROFESSIONALLY PREPARED DRAINAGE PLAN FOR PERMANENT REPAIR SHALL BE REQUIRED IF THE
EROSION IS RE -OCCURRING AND IF/WHEN THE AMOUNT OF DIRT REQUESTED, WHEN ADDED TO THE DIRT
USED IN PREVIOUS YEARS, EXCEEDS A TOTAL OF 500 CU.YDS. (RHMC Sections15.04.130 and 15.04.150)
Property Owner(s) )/Gt-,t'-?'
avA-e,L.Ager e
Phone No(s). 5 24 O — ? 9 yV
Reason(s) to export/import soil. Has the area eroded previously? Has it been previously corrected with import/export of
dirt?
L `-ZS`1!I L S,
(ec-+o s/> v ," Of s 40/44/ /c ' . C} G' S 4 6/e
//// i (GifecA -Ar2
To your best recollection how many times has the area eroded? When?
7
How much dirt was imported in the past (total of all events)
PICTURES OF THE ERODED AREA(S): Submitted:
ADDRESS Cr&L c,,l/ Yy,g4A7
Where soil is proposed to be moved FROM
ADDRESS v / ` C--b16tre / ''
Where soil is to be moved TO' �'
AMOUNT of soil to be moved (cu.yds.): %v AREA (square feet) to be corrected
cJ
WORKING AT THE JOB SITE The City Building Inspector/staff must verify that the area has eroded and the amount of
soil to be moved, followed by an inspection of the repaired area. You must notify City staff should there be deviations or
corrections in the field to modify the approved project. The Rolling Hills Municipal Code requires that all graded areas be
balanced on site and prohibits the export or import of soil to or from any lot in the City or to and from outside the City
unless approved by the City Manaaer/desianee under certain conditions.
SOIL FOR EROSION CONTROL
2011
AUG 2 8 2014
City of Rolling Hills
By .
I understand and agree to abide by these requirements.
Date Contractor/Applicant's Agent / License No.
Ph ne:
APPROVED:
Owner/Applicant
lc) 5 S
TI29l�‘1 l ��
DATEI
CONDITIONS:
MANAGER OROSIGNEE
knAlt dri( 1,,,f771 ,)04-14;74.,,L
Wv\lt evat-e k 51\9p. (.0? ct,6r,„ 44.1z-ti /xi 2.01,9
aiu.hama44>y.;, '(f,t Qt�e'vi�Gcr Jr (:�t
�1
SOIL FOR EROSION CONTROL
2011