Proposal NV 5 - Engineering Services to Prepare Sewer Improvement Plansif *. -
� T7 z
` .1 <f fir, tA1,� �-� ' ::
- '_,.. p y-� �� - .,l '
�_ era '!:;- '•'�' � � .:1f`'�d' /���.�- ;v�s.�• ' -..:� , � .. ,�,,,��., - • � i#t� "'—J�z
.. • . ,ne — [ 1lig
_s...r-r
QJ
N
V
5 PROPOSAL
Submitted by NV5, Inc.
163 Technology Drive, Suite 100, Irvine, CA 92618
City of Rolling Hills
8" Sewer Main along Portuguese Bend Road/
Rolling Hills Road
July 13, 2020
BLE OF CONTENTS
Cover Letter
Proposer's Background
Qualifications + Experience
Project Approach
Proposed Personnel
Quality Assurance/Quality Control Procedures
References
Schedule + Schedule Control
Fee Schedule/Cost Proposal
01
02
04
07
10
22
23
24
26
City of Rolling Hills I 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5
PN: P27020-0004239.00
July 13, 2020
City of Rolling Hills
Attn: Elaine Jeng, P.E., City Manager
2 Portuguese Bend Road
Rolling Hills, CA 90274
SUBJECT: Engineering Services to Prepare Sewer Improvement Plans
N
V
5
Dear Ms. Jeng,
NV5, Inc. is excited to have the opportunity to provide Engineering Services to the City of Rolling Hills (City) for its 8" Sewer
Main along Portuguese Bend Road/Rolling Hills Road project. Our team has the knowledge and experience to assure your
project is completed on schedule and within budget. NV5's strengths include the following:
Current Partnership: NV5 is contracted through the City of Rancho Palos Verdes for the Rolling Hills Sewer Connection
Concept Design, which explores the feasibility of a sewer connection for the residents adjacent to the Portuguese
Bend area of Rolling Hills. The parcels are currently utilizing on -site septic disposal systems and our team is evaluating
the concept of a sewer connection to include the required conveyance and pumping facilities to provide discharge of
wastewater generated in portions of Rolling Hills' tributary to the existing Rancho Palos Verdes' collection system. The
project requires involvement from City staff and stakeholders from Rolling Hills and Rancho Palos Verdes.
In addition, NV5 is working with the City and directly with Ms. Jeng on the formation of the Eastfield Drive Utility
Undergrounding Assessment District. Our services include preparing a preliminary and final Engineer's Report, boundary
map and diagram; attending City Council meetings, staff meetings and utility coordination meetings; recording documents
and maps, and more. Our constant communication with City staff for this project and knowledge of your community and
stakeholders has given us insight into how the City operates, enabling us to provide outstanding cost- and time -efficient
services.
Relevant Experience: NV5 has a proven track record of successfully providing professional engineering design services
to municipalities throughout Southern California, most of which have been repeat clients. Our proposed project team has
completed several pipeline improvement projects for various clients, and details on our most relevant project experience
can be found starting on page 4.
Proposed Team: NV5 offers the City a team of dedicated engineering design professionals with an unparalleled
reputation and proven expertise. Understanding both the project requirements and scope of work requested by the City,
we have selected David Maher, PE, QSD/QSP, as Project Manager. Mr. Maher has more than 14 years of Public Works
experience, which includes water/wastewater pipeline improvement projects throughout Southern California.
COVID-19: The health and safety of our employees and those that they come into contact with is of highest importance.
NV5 has instituted field safety protocols based on guidelines from the CDC, WHO and OSHA to help reduce our staff's risk
of exposure to COVID-19. In addition, all of our staff are provided with the necessary equipment and are up-to-date and
have access to the latest technologies, allowing them to work remotely effectively.
Statement: I have read, understood, and agreed to all statements in this request for proposal and acknowledge receipt of
all addendums/amendments as well as to the terms, conditions, and attachments referenced.
NV5 looks forward to the opportunity to work with the City and help you achieve your goals and objectives. If you need
further information, we may be reached by phone at (949) 585-0477, or electronically at jeff.cooper@nv5.com and
david.maher@nv5.com. Thank you for your time and consideration.
Sincerely,
NV5
fey
Je . cooper, PE
Di of Infrastructure
David Maher, PE
Project Manager
COMPANY INFORMATION/CONTACT
Name: NV5, Inc.
Authorized Signer: Jeffrey M. Cooper, PE
Address 163 Technology Drive, Suite 100,
Irvine, CA 92618
Telephone Number: (949) 585-0477
Email of Contact: jeff.cooper@nv5.com
163 Technology Drive, Suite 100 1 Irvine, CA 92618 1 www.nv5.com 1 Office: 949.585.0477 1 Fax: 949.409.8182
PROPOSER'S BACKGROUND
FIRM PROFILE
NV5, Inc. has been providing engineering and consulting services to public and private sectors for more than 70 years,
delivering solutions through five business verticals: Construction Quality Assurance, Infrastructure, Energy, Program
Management, and Environmental. With more than 100 offices nationwide and abroad, NV5 has access to over 2,000
employees in a variety of fields who help clients plan, design, build, test, certify and operate projects that improve the
communities where we live and work.
Our Irvine office specializes in the engineering design, construction management and inspection of capital improvement
projects, including: streets, traffic systems, water and wastewater systems, drainage and flood control, parks and
recreational facilities, vertical construction, and landscaping and grading. Our team includes licensed civil engineers,
licensed contractors, construction managers, certified inspectors and experienced public works professionals. All team
members have extensive experience working within the structure of municipal government and public construction policy
and will seamlessly integrate with the City's team.
KEY SERVICES
The successful delivery of our products and services has resulted in repeat clients for a broad range of municipal projects.
Our key services include:
CIVIL ENGINEERING CONSTRUCTION
DESIGN MANAGEMENT +
INSPECTION
PROJECT -
MANAGEMENT
CONSTRUCTABILITY.
REVIEW
PLAN CHECK
AND REVIEW
FEDERAL
FUNDING
MANAGEMENT
STAFF
AUGMENTATION
SURVEY
STRUCTURAL
ENGINEERING
MATERIALS
TESTING +
INSPECTION
We maintain an extensive history of working with various local agencies. Throughout the course of completing myriad
public works capital improvement projects, our team has demonstrated an unparalleled ability to work well with local
agency staff, project stakeholders, engineers and contractors. We have successfully delivered projects in a timely and
cost-effective manner, and we have acquired a keen understanding of local agency requirements, a critical element in
the facilitation and resolution of project issues. We are excited about the opportunity to continue to serve the City and
are committed to maintaining effective working relationships with your staff, relevant government agencies and project
stakeholders.
With a demonstrated ability to address public concerns, we are experts in a broad range of governmental interface, public
outreach and community involvement, and we are genuinely committed to public participation as a way of planning and
completing projects. Our team routinely performs these services as part of our delivery of public works projects and regard
them as a vital component to project success.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 2
PROPOSER'S BACKGROUND
ECORP FIRM OVERVIEW
Founded in 1987, ECORP is a California corporation that specializes in assisting government
agencies and private clients with a wide range of environmental services including technical
expertise in land use planning; biological, cultural, and water resources; and regulatory
compliance with California Environmental Quality Act (CEQA) and National Environmental
Policy Act (NEPA), Clean Water Act, federal and state Endangered Species Acts, NHPA,
and other laws and regulations. They have well -established working relationships with
the resources agencies, including the U.S. Army Corps of Engineers (USACE), California
Department of Fish and Wildlife (CDFW), Regional Water Quality Control Board (RWQCB), and
the U.S. Fish and Wildlife Service (USFWS).
ECORP provides support over the life of a project, from initial baseline studies; to environmental planning, documentation,
and review; permit negotiation, liaison with resource agencies, and mitigation design; and through to construction
supervision, monitoring, and compliance reporting. ECORP brings to the City an experienced team of more than 100 CEQA
and NEPA specialists, environmental permitting specialists, environmental analysts, terrestrial and aquatic biologists,
wetland specialists, landscape architects, engineers, hydrologists, archaeologists/cultural resource specialists, and GIS
specialists. Our current clients include numerous Public Works departments, utilities and special districts statewide.
ECORP Consulting, Inc.
2861 Pullman Street
Santa Ana, CA 92705
RELEVANT PROJECT EXPERIENCE
On -Call Master Services Agreement for Environmental Services, San Bernardino and Riverside Counties -
Yucaipa Valley Water District
ECORP is providing on -call environmental services for water and wastewater projects in the cities of Yucaipa and
Calimesa with the Yucaipa Valley Water District. Under this contract, ECORP is responsible for determining the appropriate
environmental documentation and studies needed to comply with CEQA and to obtain the appropriate environmental
permits for YVWD projects. Task orders completed under this on -call contract include the preparation and filing of
categorical exemptions for small projects, the preparation of IS/MNDs for potable and non -potable pipelines, sewers and
reservoirs, and construction monitoring.
CEQA Plus IS/MND for Slack Sewer Assessment District. YVWD proposed to create a sewer assessment district to
connect approximately 200 parcels that were served by individual septic systems to the sanitary sewer system. An Initial
Study/Mitigated Negative Declaration was prepared for the installation of approximately 9,100 linear feet (1.7 miles) of
sewer lines. Because the project would be funded by the State Revolving Fund loan program, the IS/MND was prepared to
CEQA-Plus specifications.
MND Addendum for the Expansion and Upgrade of the Henry N. Wachholz Wastewater Treatment Plant. The Yucaipa
Valley Water District proposed upgrades and an expansion of its existing wastewater treatment plant. Environmental
documentation (a Mitigated Negative Declaration) had been prepared and approved for the project. Subsequent changes
to the plan were proposed that necessitated an Addendum to the MND.
IS/MND and Permitting for a 30" Potable Water Pipeline. Prepared an IS/MND and associated permit applications for
a new, 2 -mile, 30" potable water pipeline, which would cross Wildwood Creek. Coordinated with City of Yucaipa, who was
proposing a new bridge at the pipeline location.
Road Non -Potable Water Pipelines. Prepared an IS/MND for the installation of non -potable water pipelines in 2 roadways
in the City of Yucaipa. The IS/MND was prepared on an expedited schedule to meet construction deadlines. A cultural
resources survey of pipeline alignments was completed.
Santa Ana Septic to Sewer Project - City of Santa Ana
ECORP prepared a Draft IS/MND for the proposed Septic to Sewer Conversion Project ("Project") in Santa Ana. The Project
proposes installing sewer mains and laterals and transferring existing residences and business from septic systems to
the City's sewer system in the Pasadena Street/Medford Avenue/Deodar Street and Ponderosa Street neighborhoods
previously unserved by the City. Technical studies included Air Quality/Greenhouse Gases, Energy, Noise and Phase 1
Environmental Site Assessment. The IS/MND was prepared in order to support anticipated applications for State grant
funding for sewer improvements.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 13
QUALIFICATIONS + EXPERIENCE
ROLLING HILLS SEWER CONNECTION CONCEPT DESIGN
CITY OF RANCHO PALOS VERDES 1 RANCHO PALOS VERDES, CA
The residents adjacent to the Portuguese Bend area of the City of Rolling Hills are currently
utilizing on -site septic disposal systems for wastewater disposal. Our team is contracted by the
City of Rancho Palos Verdes to explore the feasibility of providing sewer service to these parcels in
Rolling Hills. NV5 is evaluating the concept of a sewer connection to include required conveyance
and pumping facilities to provide discharge of wastewater generated in portions of Rolling Hills'
tributary to the existing Rancho Palos Verdes' collection system. General requirements for sewer
facility implementation will be identified, and an opinion of total construction and project costs will
be prepared.
CERRITOS AVENUE & SOUTH STREET WATER MAIN REPLACEMENT
CITY OF ANAHEIM 1 ANAHEIM, CA
The project includes replacing existing 10 -inch Cast Iron Pipe (CIP) and 6 -inch Asbestos -Cement
Pipe (ACP) with approximately 2,700 LF of new 12 -inch Ductile Iron Pipe (DIP) with four tie-in
connections to existing water mains; replacing existing 8 -inch CIP with approximately 350 LF of
new 12 -inch DIP with three tie-in connections to existing water mains; installing nine 12 -inch gate
valves and four fire hydrant assemblies on the new 12 -inch mains; disconnecting and removing
four hydrants on the existing mains; and replacing all existing lateral domestic water services on
the existing 8- and 10 -inch CIP and 6 -inch ACP with new services on the 12 -inch DIP.
SEWER MAIN IMPROVEMENTS
CITY OF SANTA ANA 1 SANTA ANA, CA
Our team is currently providing engineering design services for the 01d Grand Street, Santa
Clara Avenue and Wright Street Sewer Main improvements. The project consists of replacing
approximately 5,900 LF of existing sewer pipe, related laterals and manholes. Existing sewer main
pipes include 3,000 LF of 15 -inch and 2,900 LF of 12 -inch sewer main. Existing sewer laterals will
be replaced to the edge of the right-of-way to each property line. Services include preparation of
plans, specifications and cost estimates, topographic survey, manhole details and utility research/
investigation.
Sewer Connection Concept Design 1 City of Rancho Palos Verdes
Sewer Main Improvements 1 City of Santa Ana
DATES: JANUARY
2020 -CURRENT
KEY PERSONNEL:
JEFF COOPER,
VANESSA PANETO
DATES: MARCH
2020 -CURRENT
KEY PERSONNEL:
DAVID MAHER
DATES: MARCH
2019 -CURRENT
KEY PERSONNEL:
DAVID MAHER,
KHANH NGUYEN.
NHAN LY
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 4
Non -Potable Water Main Expansion 1 City of Santa Monica
QUALIFICATIONS + EXPERIENCE
NON -POTABLE WATER MAIN EXPANSION
CITY OF SANTA MONICA 1 SANTA MONICA, CA
NV5 is currently providing engineering design services for the expansion of the city's non -potable
water main system at various locations citywide. The system currently consists of more than
26,000 LF of ductile iron pipe ranging in diameter from 4 inches to 12 inches. Our team is
responsible for providing all PS&E, including construction drawings, documents, cost estimates,
survey, utility research, construction bidding support, traffic control plans, and construction phase
support services for this expansion. The project is being broken up into two phases. Phase 1
consists of the design of 1,400 LF of non -potable water pipe on 5th Street from Santa Monica
Boulevard to Colorado Avenue. Phase 2 includes the connection of the existing non -potable water
main running along Olympic Boulevard to the City Yards (2500 Michigan Avenue).
WALNUT STREET WATER MAIN REPLACEMENT
CITY OF LOMITA I LOMITA, CA
Our team provided engineering design services for the Walnut Street Water Main Replacement and
Street Rehabilitation. The objective of the project is to replace and upsize 1,800-LF of aging water
main and to rehab Walnut Street within the water main replacement project limit, including design
of ADA curb ramps. The project was originally designed by another firm and then revived several
years later after the City obtained the funds necessary to complete construction. Services included
reviewing and revising the existing plans, specifications and cost estimates. Design services
included utility research, constructability review, and obtaining the required Caltrans encroachment
permit for the water main connection.
CORRYNE AND SLAUSON AREA MAIN REPLACEMENTS
GOLDEN STATE WATER COMPANY I CULVER CITY, CA
Our team provided engineering design services for water line improvements for GSWC in its
Culver City Water System, located in Los Angeles County. The design consisted of replacing and
abandoning 1,600 LF of undersized pipe with 8 -inch and 12 -inch PVC, connections to existing
mains, and replacement of existing fire hydrants and water services. The project was located in the
public right-of-way (ROW) along with a portion in the Caltrans ROW. Significant coordination with
Caltrans took place throughout the project, as a section was located under the freeway overpass.
Our team also created in-house traffic control plans and obtained a Caltrans Encroachment Permit.
Walnut Street Water Main Replacement 1 City of Lomita
DATES: APRIL
2019 -CURRENT
KEY PERSONNEL:
DAVID MAHER,
KHANH NGUYEN,
NHAN LY
DATES: APRIL 2018 -
MAY 2019
KEY PERSONNEL:
DAVID MAHER,
VANESSA PANETO
DATES: FEBRUARY
2017 -DECEMBER
2017
KEY PERSONNEL:
KHANH NGUYEN,
VANESSA PANETO
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 5
QUALIFICATIONS + EXPERIENCE
KEY STAFF QUALIFICATIONS
Name/Office Location
David Maher, PE, QSD/QSP
Irvine, CA
Luanne Bean, PE
Irvine, CA
Vanessa Paneto, PE
Irvine, CA
Khanh Nguyen
Irvine, CA
Nhan Ly
Irvine, CA
Pete Golding, PLS
San Diego, CA
James Nicolau IV, PLS
Irvine, CA
Tom Holm, AICP
Santa Ana, CA
Alfredo Aguirre, AICP
Santa Ana, CA
Seth Myers
Santa Ana, CA
Role
Project
Manager
QA/QC
Manager
Project
Engineer/ 4
Designer
Project
Engineer/ 17
Designer
Project
Engineer/ 5
Designer
Survey 45
Survey 14
Environmental 35
Environmental 10
Environmental 14
Years
Education, Certifications & Licenses
B.S. Civil Engineering
14 Civil Engineer (CA) No. 86136
Qualified SWPPP Developer/Practitioner
M.S. Civil Engineering
B.S. Civil Engineering
Civil Engineer (CA) No. 50129
30 FEMA OPS - I
HAZMAT First Responder/Operations Level
DOT Offers of Bulk and Non -Bulk HAZMAT Packages
Nuclear Waste Safety for Workers
M.S. Civil Engineering
B.S. Civil Engineering
Civil Engineer (CA) No. 91559
B.S. Civil Engineering
B.S. Civil Engineering
OCTA Certified: Portland Cement Concrete
(PCC) Distress Training
OCTA Certified: Asphalt Concrete (AC) Distress Training
B.A. Mathematics
Professional Land Surveyor (CA) No. 4768
Professional Land Surveyor (CA) No. 9238
Envision Sustainability Professional/Institute for
Sustainable Infrastructure
M.A. Urban and Regional Planning
B.A. Political Science
American Institute of Certified Planners (AICP)
B.S. Urban and Regional Planning
American Institute of Certified Planners (AICP)
B.A. Environmental Studies and Planning
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 6
PROJECT APPROACH
PROJECT UNDERSTANDING
The City of Rolling Hills evaluated the feasibility of
connecting a portion of the City to a nearby existing
wastewater conveyance system. Based on the sewer
feasibility study, it is recommended to install a new 8"
sewer main along Portuguese Bend Road and upgrade
existing sewer main along Rolling Hills Road to a 10" and
12" sewer main prior to connecting to the Los Angeles
County Trunk line. The new sewer extension will serve the
City Hall, a Tennis Court Site and upstream properties. NV5
will note the recommendations expressed by Wildan in the
Sewer Feasibility Study and make recommendations as
discovered during the design process.
SCOPE OF WORK
The NV5 team has the size, depth and experience
to commit the necessary personnel to meet your
schedules and deadlines. The scope of work includes the
preparation of plans, specifications, engineer's estimate
of probable construction cost and bid support services
for the installation of the new gravity sewer line. We are
represented by highly experienced professionals who have
proven track records managing public works projects.
Our professional engineering design services for this -
project will include all services as listed in the Request for
Proposal (RFP) including but not limited to the following:
1. Project Management and Administration
1.1 Meetings
We have included sufficient time and budget in our
proposal to manage the project from start to finish
including progress, budget and schedule oversight for
in-house and sub consultant work. Our tasks for project
management and administration include:
• Following the notice to proceed, NV5 will schedule
and attend a kick-off meeting with City staff to initiate
the project; establish lines of communication; review
and refine, if needed, the project scope of work and
schedule; establish design guidelines; discuss project
parameters and constraints; and obtain background
information.
• Participate in meeting(s) with City staff to discuss the
project objectives and attend City Council meeting
to answer any questions. Expected meetings listed
below.
o Scoping/Kick Off (2)
o Utility (2)
o Stakeholders (2)
o City Council (2)
o Design Review with Staff (2)
1.2. CEQA Process Overview
Our subconsultant ,ECORP, will prepare a technical
memorandum that specifically addresses the feasibility of
pursuing the following CEQA processes and determinations
for the project - CEQA Statutory Exemption; or CEQA
Categorical Exemption; or CEQA Initial Study and Mitigated
Negative Declaration (IS/MND). Considerations associated
with each approach are briefly described as follows.
Statutory Exemption
Using the Project information provided by the City, our
team will determine if the Project fits the requirements for
a statutory exemption. A preliminary review of the Project
indicates that the Sewer Main Improvement project may
qualify for a Statutory Exemption in accordance with
Section 15282(k) of the CEQA Guidelines. This exemption
allows for installation of new pipeline or the maintenance,
repair, restoration, reconditioning, relocation, replacement,
removal, or demolition of an existing pipeline within a
public street or highway or any other public right-of-way
as long as the project does not exceed one mile in length.
There are no CEQA exceptions to review for a Statutory
Exemption. Environmental process issues and feasibility of
this approach will be addressed in the memorandum.
Categorical Exemption (CE)
Our team will review the list of Categorical Exemptions
(CE) in CEQA § 15300 to 15332 to determine if the
Project fits any of the requirements for a CE. The
technical memorandum will address the CE Exceptions
(§15300.2) for CE Classes where these exceptions apply.
Environmental considerations, the potential need for
any supporting technical studies, and feasibility of this
approach will be discussed in the memorandum.
Initial Study and Mitigated Negative Declaration
(IS/MND)
Our team's technical memorandum will evaluate any
project environmental issues and process considerations
that would require preparation of a CEQA IS/MND.
Environmental issues, provisions for public comment,
process schedule, and potential need and advantages
of this type of CEQA document in support of future
grant funding applications, are among the issues to be
considered.
Deliverable:
Our team will submit the CEQA Process Overview and meet
with the project team and City to discuss findings and
recommendations. Should a determination be made that a
CEQA IS/MND is needed, our team will initiate this process
with preparation of the Initial Study (Task 8).
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 7
PROJECT APPROACH
1.3. Utility Research
NV5 will research and review available records and
utilities, and confirm all known underground and
overhead utilities on the project base map. The plans
and specifications will require the Contractor to pothole
locations where conflicts may occur, and those potential
locations will be clearly identified on the plans.
1.4. Project Schedule Records
NV5 will develop and maintain a project schedule for
approval based on the City approval process and grant
restrictions if applicable.
1.5. Research, Survey, and Base map Preparation
• Perform field reconnaissance to inspect, photograph
and make field notes to document the existing site
and surrounding environment and become familiar
with project conditions, limitations and possibilities.
• Research and review existing plans. The City will
provide existing plans if available. We will research
the City's records to obtain all available as -built
improvement plans and record drawings, water
and sewer atlas maps, sewer feasibility study,
parcel maps, right-of-way data, address/business
lists, reports, sample specifications and contract
documents and any other information pertinent to the
project. Collection of data will also include contact
and coordination with public and private agencies
that have utilities or facilities in the vicinity of the
project area to obtain their records and requirements.
• NV5 will provide a base map for the sewer main
realignment project.
o The base map will include aerial photogrammetry
for preparation of the base construction drawings.
o The base map will include all manholes, water
valves, utility vaults, power poles, and other visible
facilities. These will all be identified on the map.
o NV5 will prepare base construction drawings on
24"x36" sheets with a standard City title block,
using AutoCAD format. The plan and profile sheet(s)
will be prepared at a horizontal scale of 1" = 40'
and a vertical scale of 1" =4'.
o The base construction drawings will include the
standard signature block, sewer general notes,
locations/sizes of all utilities, locations of buried -
infrastructure, above ground improvements,
easements, property lines, rights -of -way, property
addresses and pertinent survey data.
2. Design (Plans Specifications and Cost Estimate)
The construction plans will be prepared to conform to the
general requirements of the City with consideration for
the needs of the contractor's construction operations.
NV5 will deliver completed and approved construction
drawings on or ahead of the project schedule. All plans will
be prepared and submitted considering value engineering
and in a manner that ensures a complete design approved
by the City with assumed three (4) plan checks during
the submittals (65%, 90% and 100% and Final). The
construction drawings will conform to the appropriate
applicable standards and as approved by the City. We
will meet with the City to discuss and review comments
before proceeding to prepare the next step plans. NV5 will
process the plans through the City and other agencies for
approval.
Construction plans will include plan and profile sheets for
the new and all details necessary for the construction of
the proposed facilities. Plans will be prepared in the latest
version of AutoCAD and using City's drafting standards.
Each plan sheet shall be on the standard 24 -inch by 36 -
inch sheet size. Plan and profile sheets will be scaled at
1 -inch equals 40 -feet horizontal
A. It is anticipated that the design plans will include
the following 9 plan sheets:
SHEET
T-1
G-1
TITLE
Title Sheet
General Notes, Legend, Abbreviations,
Basis of Bearings
C-1-5(5
Sheets)
C-6-8(2
Sheets)
Rolling Hills Road Sewer - Plan & Profile
Deliverables:
Details
NV5 will submit the following deliverables:
1. Mylar Plots
2. Record Drawings
NV5 will prepare record drawings for the 8 -inch Sewer
Main along Portuguese Bend Road/Rolling Hills Road
installation. We will incorporate field as -built information
provided by the City.
3. Specifications
NV5 will prepare Project Specifications at 65%, 90%,
100% and Final submittal: The specifications will conform
with the current Standard Specifications for Public Works
Construction (Greenbook). The Specifications will provide
the required permits, standards and reference materials.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 8
PROJECT APPROACH
4. Cost Estimate
NV5 will prepare an engineer's construction estimate
for the designed Project at the 65% submittal and 100%
submittal.
5. Permitting and Regulations
NV5 will prepare all necessary documents and will apply
for encroachment permits with the Cities of Rolling Hills
Estates, Torrance and Los Angeles County in order to
install the proposed sewer line within their respective
areas.
NV5 will coordinate the connection fee payment to the
California Health and Safety Code in order to discharge
into LA County's Palos Verdes North Slope Relief Trunk
Sewer Section 1. We will meet with these agencies and will
address their comments as necessary to obtain required
permits. Permit documents and approvals will be included
as an appendix to the contract documents.
6. Bid Support
We will provide bidding assistance including responding
to RFI's and RFC's, and provide sketches for clarification if
needed.
7. Construction Support Services
The NV5 team will be available to attend the
preconstruction meeting and other meetings with
staff, agencies, and the public as required. We will also
review the Contractor's submittals for conformance
with contractor documents and respond to Requests for
Information. We will also be available to clarify design
related issues at all times and obtain necessary permits
from affected agencies and utility companies.
8. Level of CEQA Service (Optional)
Pending results of the CEQA Process Review (Task 1.2),
an Initial Study/Mitigated Negative Declaration may be
required to support CEQA approvals.
CEQA Initial Study/Mitigated Negative Declaration (IS/
MND): The CEQA IS would be prepared using the approved
checklist format from the City or most recent revisions to
Appendix G of the CEQA Guidelines. Our team will prepare
a description of the project including the location of the
project area; a brief description of the environmental
setting; an identification of environmental effects using the
above -referenced checklist format; substantial evidence to
support the checklist entries; and a list of references and
preparers.
A Phase 1 Environmental Site Assessment and technical
assessments for Air Quality and Greenhouse Gas
Emissions, and Noise and Vibration are proposed.
Phase 1 Environmental Site Assessment: A Phase I
Environmental Site Assessment (ESA) will be performed
for the subject site in accordance with the ASTM Standard
Practice for Environmental site Assessments Designation
E 1527-13. The ESA report will provide a discussion
of any identified recognized environmental conditions
(RECs) and areas of concern. Indications of prior releases
of hazardous substances will be obtained via multiple
sources including but not limited to: regulatory agency
database searches, agency file searches, interviews
with personnel familiar with current and past land
use practices, review of aerial photographs, and a site
reconnaissance. Assessments for prior releases of
hazardous substances will also be made for adjacent and/
or nearby properties.
Deliverables:
• Draft/Final Technical Studies
• Administrative Draft IS/MND
• Public Review Draft IS/MND
• CEQA Notices
• Final IS/MND & MMRP
CEQA Schedule
TASK/ACTIVITY
CEQA Project
Kickoff/AB 52 Tribal
Notification(s) by City
Admin Draft IS/MND
City Review
Close of AB 52
Tribal Resources
Consultation
Draft IS/MND
Notice of Intent/
Notice of Completion
Agency/Public
Review
Final IS/MND
(includes Responses
to Comments)
City Review
Notice of
Determination
TIME FRAME FOR
COMPLETION
NTP/CEQA Project Kickoff
No later than 5 weeks from 65%
Design Plans
2 weeks
Prior to Draft IS/MND publication
1 week
With Draft IS/MND
30 calendar days
2 weeks
1 week
Filed with the Los Angeles County
Clerk Recorder within 5 days of
MND adoption
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 9
PROPOSED PERSONNEL
ORGANIZATION CHART
Our team of experts brings direct, relevant, successful and current experience working on projects of similar scope and
complexity. We are equipped with the resources to provide the City with the requested engineering services. Shown below
are team roles and responsibilities.
DIRECTOR OF
INFRASTRUCTURE
Jeffrey M. Cooper, PE
Pete Golding, PLS
James Nicolau IV, PLS
PROJECT MANAGER
QA/QC MANAGER
David Maher, PE,
QSD/QSP
PROJECT ENGINEERS/
DESIGNERS
Vanessa Paneto, PE
Khanh Nguyen
Nhan Ly
Luanne Bean, PE
ENVIRONMENTAL
*ECORP CONSULTING
Tom Holm, AICP
Alfredo Aguirre, AICP
Seth Myers
* SUBCONSULTANT
City of Rolling Hills I 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 110
PROPOSED PERSONNEL
CONTACT INFO
david.maher@nv5.com
EXPERIENCE
14 years
EDUCATION
B.S. Civil Engineering
LICENSES/CERTIFICATES
Civil Engineer (CA)
No. 86136
Qualified SWPPP
Developer
Qualified SWPPP
Practitioner
N
V
5
DAVID MAHER, PE, QSD/QSP
Project Manager
Mr. Maher has more than 14 years of experience with various capital improvement
and utility projects. His qualifications include designing various water and wastewater
projects, including mechanical, structural, civil elements utilizing CAD software, and
project coordination. He has both design and construction management experience
with projects, such as sewage treatment plants that included several types of buildings
like above -ground and underground concrete tanks, precast concrete manholes,
retaining walls, administration buildings, and tankers discharge facilities. He has
extensive real -world knowledge in the fields of construction superintendent experience,
project cost control, subcontracts management, scheduling and cost estimation, plan
checking, and permit coordination.
Project Experience
Non -Potable Water Main Expansion
CITY OF SANTA MONICA 1 SANTA MONICA, CA
Project Manager. Mr. Maher is responsible for preparation of plans, specifications,
cost estimates, and oversight for the expansion of the city's non -potable water main
system at various locations citywide. The system currently consists of more than
26,000 LF of ductile iron pipe, ranging in diameter from 4 inches to 12 inches.
Our team is responsible for providing all PS&E, including construction drawings,
documents, cost estimates, survey, utility research, construction bidding support,
traffic control plans, and construction phase support services for this expansion.
Cerritos Avenue & South Street Water Main Replacement
CITY OF ANAHEIM 1 ANAHEIM, CA
Project Manager. Mr. Maher is managing the team preparing the plans, specifications
and cost estimates for the installation of new water mains at Cerritos Avenue and South
Street. The project includes replacing existing 10 -inch Cast Iron Pipe (CIP) and 6 -inch
Asbestos -Cement Pipe (ACP) with approximately 2,700 LF of new 12 -inch Ductile Iron
Pipe (DIP) from Brookhurst Street to Nutwood Street with four tie-in connections to
existing water mains; replacing existing 8 -inch CIP with approximately 350 LF of new
12 -inch DIP from Disneyland Drive to Hazelwood Street with three tie-in connections to
existing water mains; installing nine 12 -inch gate valves and four fire hydrant assemblies
on the new 12 -inch mains; disconnecting and removing four hydrants on the existing
mains; and replacing all existing lateral domestic water services on the existing 8- and
10 -inch CIP and 6 -inch ACP with new services on the 12 -inch DIP.
Walnut Street Water Main Replacement and Street Rehabilitation
CITY OF LOMITA 1 LOMITA, CA
Project Manager. Mr. Maher provided engineering design services for the Walnut
Street Water Main Replacement and Street Rehabilitation. The project was originally
designed by another firm and then revived several years later after the City obtained
the funds necessary to complete construction. Services included reviewing and
revising the existing plans, specifications and cost estimates, including conducting
utility investigation, constructability review, and obtaining the required Caltrans
encroachment permit for the water main connection.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 11
PROPOSED PERSONNEL
Flower Street, 17th Street & Greenleaf Street Sewer Main Improvements
CITY OF SANTA ANA 1 SANTA ANA, CA
Project Manager. Mr. Maher oversaw the team that provided engineering design services for the Flower Street, 17th
Street and Greenleaf Street Sewer Main Improvements project. The project consists of replacing approximately 4,500 LF
of existing sewer pipe, related laterals and manholes. Pipe diameters range from 8 inches to 15 inches. Existing sewer
laterals will be replaced to the edge of the right-of-way to each property line. Services include preparation of plans,
specifications and cost estimates, topographic survey and utility research/investigation.
Grandview Pump Station
CITY OF GLENDALE DEPARTMENT OF WATER & POWER 1 GLENDALE, CA
Project Manager. Mr. Maher is leading the team providing engineering services for design and construction support of the
Grandview Pump Station Replacement. Our team is preparing plans, specifications and cost estimate for the removal and
replacement of the existing Pump and Motor No. 2 with a new pump and motor. Grandview Pump Station is more than 70
years old and pumps about 25 percent of the City's water supply. The main goal of the project is to increase the reliability
and efficiency of the facility by replacing the 72 -year -old Pump No. 2, which continues to experience failures. In addition,
NV5 is coordinating with the City's SCADA integrator to ensure all modifications during the design will be in line with the
City's control system.
Leahy Avenue Well Drilling and Equipping
BELLFLOWER SOMERSET MUTUAL WATER COMPANY 1 BELLFLOWER, CA
Project Manager. Mr. Maher is managing our team's civil and mechanical engineering design and technical specifications
for the abandonment of an existing well and equipping of a new high -capacity groundwater well, located on BSMWC's
property at 14740 Leahy Avenue. The well equipping design is coordinated with the new well drilling and pump test data
provided by Geoscience Services.
North Bay Intake Pump Station Replacement
LAKE ARROWHEAD COMMUNITY SERVICES DISTRICT 1 LAKE ARROWHEAD, CA
Project Engineer. The project included an onshore pump station, 20 -inch CML discharge water pipeline, 450 feet of
18 -inch HDPE intake water pipeline, 220 feet of 12 -inch HDPE overflow pipeline, three offshore pumps, restroom, and
electrical building extension, site plan for new facilities, including grading, and demolition plans of existing facilities.
Managed structural and electrical design coordination, utilities research, and dewatering during construction to existing
sewer network using temporary duty and standby pumps, and high -line pipeline. The project included an onshore pump
station concrete building that consists of a wet well floor, second floor for three 1,300-gpm pumps and surge tank,
roof floor and stairs; a restroom building that complies with ADA requirements; and mechanical plans and sections.
Construction management included reviewing and approving submittals and construction schedule, answering RFIs,
reviewing change orders, progress meeting and site visits. Mr. Maher also provided construction support services.
Equipping Well No. 240 / Well No. 205 Replacement
RANCHO CALIFORNIA WATER DISTRICT 1 TEMECULA, CA
Project Engineer. The project included demolition of existing Well No. 205, site plan and equipping for new Well No. 240
facilities. Design elements for the 1,800-gpm vertical turbine wellhead included pump and motor pedestal; on -site sodium
hypochlorite generation (OSG) system; MCC; electrical design and power coordination with SCE; 12 -inch CML&C discharge
piping, and a 6 -inch pump to waste and high-pressure control piping; wellhead product water lubrication system; and
chemical feed line and connections.
Murrieta Road Booster Pump Station Replacement
EASTERN MUNICIPAL WATER DISTRICT 1 MURRIETA, CA
Mechanical Design Engineer. The project included a replacement of an existing pump station; preparing a study for best
options to operate the existing pump station while constructing the new station; relocation of existing bypass piping; new
facility discharge piping, including pump selection, bypass piping, fittings, valves and meters; chlorine and ammonia units;
and chemical piping and injection points.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 12
PROPOSED PERSONNEL
CONTACT INFO
luanne.bean@nv5.com
EXPERIENCE
30 years
EDUCATION
M.S. Civil Engineering
B.S. Civil Engineering
LICENSES
Civil Engineer (CA)
No. 50129
REGISTRATIONS
FEMA OPS - I
HAZMAT First Responder/
Operations Level
DOT Offers of Bulk
and Non -Bulk HAZMAT
Packages
Nuclear Waste Safety
for Workers
N
V
5
LUANNE BEAN, PE
QA/QC Manager
Ms. Bean has more than 30 years of experience in the design and management of
water and wastewater projects. Her technical skills include structural analysis and
design, mechanical analysis, instrumentation and control, the preparation of plans,
specifications and cost estimates, as well as construction management. She has
held various positions with many public agencies, including the Long Beach Water
Department, Victor Valley Wastewater Reclamation Authority, Indio Water Authority,
Metropolitan Water District, and FEMA. Ms. Bean's technical experience includes large-
scale public works projects for capital improvement programs, including construction
oversight, contract administration, document control, cost and schedule control,
quality control, structural analysis, and design.
Project Experience
California Avenue Sewer Main
CITY OF CORONA 1 CORONA, CA
Construction Manager. As part of the Arantine Hills Sewer projects, Ms. Bean oversaw
the construction management and inspection services on the California Avenue Sewer
Main project, which consisted of nearly 9,000 LF of sewer main up to 24 feet deep
within the congested City streets. After initial potholing, some extensive field rework
was required to fit the sewer line into the City streets due to unforeseen conflicts
not originally shown on the plans. These conflicts were found during potholing and
necessitated going back to the Department of Health for encroachment to the City's
potable water line with the new sewer construction. NV5 also has provided public
outreach and full-time soils compaction testing for the cut -and -cover conventional
trench and bore -and -jack construction through congested intersections. This project
served the final completed run connecting the Arantine Hills Lift Station to the
Arantine Hills Force Main through this gravity interceptor, allowing conveyance of the
City's sewer to its downtown treatment plant. Upon completion of the project, the City
planned to abandon other lift stations and smaller, aging wastewater treatment plants.
Long Beach Water Department Emergency Project
LONG BEACH WATER DEPARTMENT 1 LONG BEACH, CA
Construction Manager. Ms. Bean oversaw the construction management and
inspection services for the completion of an emergency project for the Long Beach
Water Department. The project provided LBWD a connection to the Los Angeles County
Sanitation District's (LACSD) reclaimed water pipeline. While initially being constructed
by a different contractor under the jurisdiction of LACSD, after construction was
underway, LACSD's Contractor abandoned the project and LBWD agreed to take over
the work. Work involved construction of additional 25 -foot -deep shoring within 5
feet of the operational LACSD operational plant. Managing high groundwater along
with keeping the existing plant operational during construction were just a few of the
important construction missions to accomplish.
15th Street and Cherry Avenue Sewer Replacement Project
CITY OF LONG BEACH 1 LONG BEACH, CA • - `
Construction Manager. Ms. Bean was the Construction Manager for the replacement
of 565 LF of 8 -inch cement sewer to 12 -inch VCP sewer, and the reconnection of the
sewer laterals.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 13
PROPOSED PERSONNEL
CONTACT INFO
vanessa.paneto@nv5.com
EXPERIENCE
4 years
EDUCATION
M.S. Civil Engineering
B.S.'Civil Engineering
LICENSES
Civil Engineer (CA)
No. 91559
N
V
5
VANESSA PANETO, PE
Project Engineer/Designer
Ms. Paneto has more than four years of experience working on various civil engineering
projects in Orange, San Bernardino, Riverside, and Los Angeles counties, including
several small- and large- scale water/wastewater capital improvement projects and
utility undergrounding projects. She is proficient in AutoCAD and preparing hydrology,
WQMP/LID, and SWPPP reports. Her professional and dedicated civil engineering
experience stems from increasingly responsible positions within public agencies,
including the City of San Juan Capistrano.
Project Experience
Rolling Hills Sewer Connection Concept Design
CITY OF RANCHO PALOS VERDES 1 RANCHO PALOS VERDES AND ROLLING HILLS, CA
Assistant Engineer. Ms. Paneto is assisting the team contracted by the City of Rancho
Palos Verdes to explore the feasibility of providing sewer service to parcels adjacent to
the Portuguese Bend area of the City of Rolling Hills who are currently utilizing on -site
septic disposal systems for wastewater disposal. Our team is evaluating the concept of
a sewer connection to include required conveyance and pumping facilities to provide
discharge of wastewater generated in portions of Rolling Hills' tributary to the existing
Rancho Palos Verdes' collection system. General requirements for sewer facility
implementation will be identified, and an opinion of total construction and project
costs will be prepared.
Union Avenue Sewer Lateral Rerouting
CITY OF WHITTIER 1 WHITTIER, CA
Associate Engineer. Ms. Paneto assisted in developing plans, specifications and
estimates for the replacement of an existing 85 -year -old 6 -inch water main that runs in
Union Avenue from Philadelphia Street to Penn Street along Pierce Avenue. Due to its
inaccessibility because of development of the area, the improvements would relocate
the sewer main to a more accessible location along with manholes. New mains are to
be designed with 8 -inch PVC sewer lines.
Corryne and Slauson Area Main Replacements and Abandonment
GOLDEN STATE WATER COMPANY 1 CULVER CITY, CA
Assistant Engineer. Ms. Paneto assisted in the design and draft of plans for the
replacing and abandoning of 1,600 LF of undersized and old 4 -inch, 6 -inch, and
10 -inch cast iron water mains with 8 -inch and 12 -inch PVC in the public right-of-way
(ROW). The purpose of this project is to improve water quality, increase fire flows,
reduce maintenance costs, and improve system reliability within the GSWC service
area. This project is set to be constructed in five sequences.
Palm Avenue Infrastructure Improvements
CITY OF WHITTIER 1 WHITTIER, CA
Associate Engineer. Ms. Paneto assisted in developing plans, specifications and
estimates for replacement of an existing 85 -year -old 6 -inch water main, 8 -inch
sewer main with 8 -inch SDR-35 sewer main and street reconstruction along Palm
Avenue between Whittier Boulevard and Beverly Boulevard. This reach will replace
approximately 5,000 LF of pipeline and street pavement.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 14
PROPOSED PERSONNEL
CONTACT INFO
khanh.nguyen@nv5.com
EXPERIENCE
17 years
EDUCATION
B.S. Civil Engineering
N
V
5
KHANH NGUYEN
Project Engineer/Designer
Mr. Nguyen has more than 17 years of project engineering and management
experience in water, wastewater and civil engineering. As a staff engineer, his work
includes preparing construction design reports, engineering plans and specifications
for water and recycled water pipelines design, street and storm drain planning
and design, grading and earthwork calculation using AutoCAD Civil 3D, reservoir
rehabilitations, pump facilities, hydraulic analysis, and water and wastewater facilities
planning. His pipeline design projects include pipeline alignments and profiles for
domestic water, reclaimed water and sewer lines.
Project Experience
Flower Street, 17th Street & Greenleaf Street Sewer Main Improvements
CITY OF SANTA ANA 1 SANTA ANA, CA
Design Engineer. Mr. Nguyen provided engineering design services for the Flower
Street, 17th Street and Greenleaf Street Sewer Main Improvements project. The
project consists of replacing approximately 4,500 LF of existing sewer pipe, related
laterals and manholes. Pipe diameters range from 8 inches to 15 inches. Existing
sewer laterals will be replaced to the edge of the right-of-way to each property line.
Services include preparation of plans, specifications and cost estimates, topographic
survey and utility research/investigation.
Non -Potable Water Main Expansion
CITY OF SANTA MONICA 1 SANTA MONICA, CA '
Design Engineer. Mr. Nguyen is providing engineering design services for the
expansion of the city's non -potable water main system at various locations citywide.
The system currently consists of more than 26,000 LF of ductile iron pipe, ranging in
diameter from 4 inches to 12 inches. Our team is responsible for providing all PS&E,
including construction drawings, documents, cost estimates, survey, utility research,
construction bidding support, traffic control plans, and construction phase support
services for this expansion.
Palm Avenue Infrastructure Improvements
CITY OF WHITTIER 1 WHITTIER, CA
Design Engineer. Mr. Nguyen designed/drafted plans and specifications for
replacement of an existing 85 -year -old 6 -inch water main, 8 -inch sewer main with
8 -inch SDR-35 sewer main and street reconstruction, along Palm Avenue between
Whittier Boulevard and Beverly Boulevard. This reach will replace approximately 5,000
LF of pipeline and street pavement.
Corryne and Slauson Area Main Replacements and Abandonment
GOLDEN STATE WATER COMPANY 1 CULVER CITY, CA
Design Engineer. Mr. Nguyen designed/drafted plans for the replacing and
abandoning of 1,600 LF of undersized and old 4 -inch, 6 -inch, and 10 -inch cast iron
water mains with 8 -inch and 12 -inch PVC in the public right of way (ROW). The purpose
of this project is to improve water quality, increase fire flows, reduce maintenance
costs, and improve system reliability within the GSWC service area. This project is set
to be constructed in five sequences.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 115
PROPOSED PERSONNEL
CONTACT INFO
nhan.ly@nv5.com
EXPERIENCE
5 years
EDUCATION
B.S. Civil Engineering
LICENSES/CERTIFICATES
OCTA Certified: Portland
Cement Concrete (PCC)
Distress Training
OCTA Certified: Asphalt
Concrete (AC) Distress
Training
AFFILIATIONS
American Society of Civil
Engineers (ASCE)
California Land Surveyors
Association (CLSA)
N
V
5
N HAN LY
Project Engineer/Designer
Mr. Ly has more than five years of experience working on various civil/electrical
engineering projects throughout California. His professional experience includes
preparing construction plans, design services, and cost estimates for various projects.
He is proficient in AutoCAD, MicroStations, GIS, Ed Web Viewer, FAA, FFE/EES, SAP,
Osmose 0-Calc, JPA, and ProjectWise technical software. Mr. Ly is also fluent in
Vietnamese and possesses strong management and leadership skills.
Project Experience
Abalone Cove Lift Station Improvements
CITY OF RANCHO PALOS VERDES 1 RANCHO PALOS VERDES, CA
Assistant Engineer. Mr. Ly is assisting the team providing engineering design services
for the Abalone Cove Sewer System Improvements project. The sewer includes four lift
stations. The two larger lift stations (Sweetbay/Altimira and Abalone Cove) have been
converted to allow the use of 3 -phase electrical power for the duplex 10 -HP pumps and
the two smaller lift stations (Thyme and Sweetbay East) currently operate using the
originally installed electrical system, which provides single-phase power to the duplex
7'/2 -HP pumps. Improvements will include improving the condition and capacity needs
of the four lift stations. Our team is responsible for providing all plans, specifications,
and estimates including lift station mechanical and electrical upgrades and details,
SCADA alarm notification equipment detection, construction schedule, engineers
estimate of probable cost and plan review meetings after each submittal.
Non -Potable Water Main Expansion
CITY OF SANTA MONICA 1 SANTA MONICA, CA
Assistant Engineer. Mr. Ly is assisting the team providing engineering design services
for the expansion of the city's non -potable water main system at various locations
citywide. The system currently consists of more than 26,000 LF of ductile iron pipe,
ranging in diameter from 4 inches to 12 inches. Our team is responsible for providing
all PS&E, including construction drawings, documents, cost estimates, survey, utility
research, construction bidding support, traffic control plans, and construction phase
support services for this expansion.
Walnut Street Water Main Replacement and Street Rehabilitation
CITY OF LOMITA 1 LOMITA, CA
Assistant Engineer. Mr. Ly is assisting the team providing engineering design
services for the Walnut Street Water Main Replacement and Street Rehabilitation.
The objective of the project is to replace and upsize 1,800-LF of aging water main,
and to rehab Walnut street within the water main replacement project limit that
include design of ADA curb ramps. The project was originally designed by another firm
and then revived several years later after the City obtained the funds necessary to
complete construction. Services included reviewing and revising the existing plans,
specifications and cost estimates, Design services included including conducting
utility research investigation, constructability review, and obtaining the required
Caltrans encroachment permit for the water main connection. He is currently providing
construction support services on the project.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 16
PROPOSED PERSONNEL
ECORP Consulting, Inc.
ENVIRONMENTAL CONSULTANTS
Tom Holm, AICP
Senior Environmental Planner/Project Manager
Mr. Holm offers over 35 years of diverse group management and environmental planning experience on a
variety of environmental, natural resource and regulatory compliance projects. He has been actively
involved in broad -based NEPA and CEQA-related projects throughout Southern and Central California
including transportation corridors and highways, major public works and infrastructure, large master -
planned communities, and water resources projects.
Education/Certifications
• M.A., Urban and Regional Planning, University of California, Los Angeles
• B.A., Political Science, University of California, Irvine
• American Institute of Certified Planners (AICP)
Professional Experience
Septic to Sewer Project for Multiple Streets in a Residential Area, Orange County — City of Santa Ana
as a Sub to Huitt-Zollars. Project Manager. The project proposed installing sewer mains and laterals and
transferring existing residences and business from septic systems to the City's sewer system in the
Pasadena Street/Medford Avenue/Deodar Street and Ponderosa Street neighborhoods previously unserved
by the City. Prepared a draft CEQA Initial Study/Mitigated Negative Declaration, supported by Air
Quality/Greenhouse Gases, Noise and Phase 1 Environmental Assessments for the Project. The CEQA
document was prepared to support a grant application for state funding for sewer improvements.
San Juan Creek Property, Orange County — South Coast Water District. EIR. Managed feasibility
studies, Concept Master Plan development and certified Program EIR for SCWD's 30.5 -acre property in the
Capistrano Beach district in the City of Dana Point. The EIR consolidated and updated all previous plans and
environmental documentation in order to evaluate impacts of long-range master plan alternatives for the
phased, integrated development of District facilities, commercial uses and open space.
Victoria Wastewater Treatment Plant, Orange County — South Coast Water District. Project Director.
Supervised an MND to support demolition and removal of the Victoria WWTP at the District's Capistrano
Beach property.
Open Reservoir Water Quality Improvement Program Environmental Review, Los Angeles County —
City of Los Angeles. CEQA/NEPA Review Team Lead. Performed review of environmental databases,
technical studies, and EIR sections for LADWP, the Mediation Institute and member homeowner
associations of the Coalition to Preserve Open Reservoir (CPOR). Projects included the Hollywood Water
Quality Improvement Project EIR, the Stone Canyon Reservoir Water Quality Improvement Project EIR, and
Rowena Reservoir Expanded IS/MND. Work included adequacy reviews of technical studies and EIR sections
prepared by Los Angeles Department of Water and Power, and CEQA training workshops for LADWP staff
and CPOR.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 17
PROPOSED PERSONNEL
ECORP Consulting, Inc.
ENVIRONMENTAL CONSULTANTS
Alfredo Aguirre, AICP
Senior Environmental Planner
Mr. Aguirre's professional experience involves California Environmental Quality Act (CEQA) and National
Environmental Policy Act (NEPA) analysis and document preparation for government agencies and private
clients. He has prepared a variety of environmental documents, including Initial Studies (IS), Negative
Declarations, Mitigated Negative Declarations (MNDs), Environmental Impact Reports (EIRs), Environmental
Assessments (EAs), and Environmental Impact Statements (EIS). His mix of skills in urban planning,
environmental analysis, and GIS allow him to assist public agency and private clients with entitlement,
environmental documentation, and permitting for development, infrastructure, recreation, and alternative
energy projects throughout southern California. In addition to writing environmental reports, Mr. Aguirre
also conducts biological field surveys and assists with the preparation of biological resource documents.
Mr. Aguirre conducts general and focused biological surveys for listed and/or sensitive wildlife species in
southern California. He has experience conducting focused surveys for desert tortoise and burrowing owl
and conducting jurisdictional delineations. He has also conducted biological monitoring for construction
projects where he works with construction crews to avoid sensitive vegetation communities and wildlife
resources. Mr. Aguirre has experience in the use of Geographic Information Systems (GIS) as an analysis
tool for environmental studies. He has experience in the use of ESRIs ArcGIS software. Mr. Aguirre also has
experience in the collection of field data with survey grade global positioning system (GPS) units including
Trimble GeoXTs, Junos, and Yumas.
Education/Certifications
• B.S., Urban and Regional Planning, with a minor in Geographic Information Systems, California State
Polytechnic University, Pomona
• American Institute of Certified Planners (AICP), June 2016, Certified Planner Number: 028966
Professional Experience
East Side Dike Improvement Project, Phase 1, Riverside County — Coachella Valley Water District.
Project Manager that prepared CEQA documentation and oversaw regulatory permitting for the Project.
Moreno Master Drainage Plan Line H-2 Interim Drain Project, Riverside County — City of Moreno
Valley. Project Manager that prepared CEQA documentation and oversaw regulatory permitting for the
Project.
Environmental Permitting and CEQA Document Processing Services, Multiple Counties — Golden
State Water Company. CEQA Task Lead. Provided CEQA analysis and document preparation to assist the
GSWC with environmental permitting for water supply and other projects throughout GSWC's service areas.
The State Water Resources Control Board, Division of Drinking Water, served as lead agency for most of
the projects. Project types included new and replacement of water tanks, water supply wells, and treatment
plants.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 18
PROPOSED PERSONNEL
ECORP Consulting, Inc.
ENVIRONMENTAL CONSULTANTS
Seth Myers
Senior Air Quality/GHG/Noise Analyst
With 14 years of experience as an environmental planner and air quality/noise analyst, Mr. Myers is
involved in the preparation of a full range of CEQA and NEPA environmental compliance and review
documents including environmental impact reports. He has extensive expertise conducting air quality,
greenhouse gas emissions, and noise analyses and has a comprehensive working knowledge of the
associated regulatory environment. He is proficient in the use of CaIEEMod, EMFAC2017, AERMOD,
SoundPLAN, the Roadway Construction Model, the Federal Highway Administration (FHWA) Highway
Traffic Noise Prediction Model, and other industry standard emissions and noise modeling tools. In
addition, Mr. Myers prepares implementation documents and programs such as zoning ordinance updates,
design review programs, and planning program guidelines. As a certified arborist (ISA #WE -7501A), Mr.
Myers also provides landscape and irrigation plan review for development and public works projects and
performs hazardous tree assessments.
Education
B.A., Environmental Studies and Planning (Minor in Biology), Sonoma State University
Professional Experience
Wastewater Treatment Plant Improvements Project, Amador County — City of Jackson. Analyzed the
environmental issue topics of air quality, greenhouse gas emissions, and cultural resources in this EIR. This
Project consisted of improvements to the City's wastewater treatment plant (WWTP) and changes to the
associated discharge practices to comply with more stringent waste discharge requirements issued by the
Central Valley Regional Water Quality Control Board. The City proposed to improve the WWTP (including
wastewater treatment processes and effluent disposal methods) to meet the City's existing and future
needs within the limits of the permitted capacity of the existing WWTP. A key issue involved improving the
City's wastewater effluent quality and disposal method in a manner that protects the existing beneficial
uses of Jackson Creek and Lake Amador.
Ebbetts Pass Project, Calaveras County — Calaveras County Water District. The Calaveras County Water
District (CCWD) proposed approximately 24,500 lineal feet of new water pipeline, hydrants, blow -off valves,
and main line valves to replace existing facilities constructed in 1965. The existing Ebbetts Pass Reach 1
pipeline is predominately located within Caltrans SR -4 right-of-way (ROW) and the replacement pipeline
will also be placed within the SR -4 ROW and constructed as close as practical to the existing pipeline,
which is primarily located past edge of pavement within the south shoulder.
Septic to Sewer Project, Orange County — City of Santa Ana. Analyzed the potential emissions and
noise -related effect of installing sewer mains and lateral connecters to transfer existing residences and
businesses currently employing the use of septic systems to the City's sewer systems. The Project site
encompasses 635 linear feet entirely within the public right-of-way.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 19
PROPOSED PERSONNEL
CONTACT INFO
pete.golding@nv5.com
EXPERIENCE
45 years
EDUCATION
B.A. Mathematics
LICENSES
Professional Land
Surveyor (CA) No. 4768
(exp. 3/31/2020)
AFFILIATIONS
Member, California Land
Surveyors Association
(CLSA)
Member, International
Right -of -Way Association
N
V
5
PETE GOLDING, PLS
Survey
Mr. Golding brings 45 years of experience that includes a wide variety of projects
in both land development and public works projects. He has completed surveying
projects in California, Nevada and Wisconsin, and his expertise includes hundreds of
boundary retracements, many involving the Public Land Survey System, GPS surveying,
map and ALTA production, and construction surveying. He has extensive office and
field experience supporting his clients. He has prepared hundreds of plats and legal
descriptions. He has prepared and been in responsible charge of many Parcel Maps,
Final Maps and Records of Survey. He also has performed many topographic surveys
by photogrammetric methods, as well as by field collection methods.
Project Experience
Camel Point Water Line
SOUTH COAST WATER DISTRICT 1 DANA POINT, CA
Survey Manager. Mr. Golding served as the Survey Manager for the topographic survey
of Camel Point Drive for the South Coast Water District project to replace an aging
water line.
Beverly Hills Water Treatment Plant
CITY OF BEVERLY HILLS 1 BEVERLY HILLS, CA
Mr. Golding was responsible for providing a detailed topographic survey of two blocks
of City streets. A photogrammetric survey was performed, then augmented with field
shots using GPS, a conventional total station and a survey level. Driveways and other
private improvements were critical components of this survey. Boundary surveying also
was performed in order to accurately determine the right-of-way limits of the street.
Citrus Avenue Street Improvements
CITY OF IMPERIAL BEACH 1 IMPERIAL BEACH, CA
Survey Manager. Mr. Golding was responsible for providing a detailed topographic
survey of two blocks of City streets. A photogrammetric survey was performed, then
augmented with field shots using GPS, a conventional total station, and a survey level.
Driveways and other private improvements were critical components of this survey.
Boundary surveying also was performed in order to accurately determine the right-of-
way limits of the street.
MacKinnon Avenue Improvements
CITY OF ENCINITAS 1 ENCINITAS, CA
Survey Manager. Mr. Golding provided a detailed topographic survey of streets in the
vicinity of a vehicular bridge over 1-5. The survey was a combination of data derived
using GPS equipment, as well as a conventional total station. Boundary surveying was
performed in order to accurately determine the right-of-way limits of the street. Survey
boundary monuments were destroyed (obliterated, not lost) during the construction
of the project and were subsequently replaced. He was also responsible for the
construction staking of the new improvements.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 20
PROPOSED PERSONNEL
CONTACT INFO
james.nicolau@nv5.com
EXPERIENCE
14 Years
EDUCATION
Coursework/Surveying
Courses - Cuyamaca
Community College
LICENSES/CERTIFICATES
Professional Land Surveyor
(CA) No. 9238
Envision Sustainability
Professional/Institute for
Sustainable Infrastructure
AFFILIATIONS
President of the
California Land Surveyors
Association, San Diego
Chapter
American Council of
Engineering Companies,
California
California Association of
Realtors
National Society of
Professional Surveyors
N
V
5
JAMES NICOLAU IV, PLS
Survey
Mr. Nicolau is experienced in performing survey, mapping and design projects,
including planimetric and topographic surveys, boundary and right-of-way mapping,
land descriptions, and deed analysis. His experience includes design and as -built,
architectural, utility, topographic, subdivision mapping, and right-of-way surveys. Being
a second generation surveyor in Southern California with 14 years of Land Surveying,
Project Management and Real Estate expertise in both the private and public sectors
has given him the opportunity to be involved in some of San Diego's highest -profile
projects, including Petco Park, San Diego County Administration's Waterfront Park,
San Diego Gas & Electric's joint venture with the Gas Company on the Pipeline Safety
Enhancement Plan (PSEP), and Scripps Hospitals' Proton Therapy Center, among many
others.
Project Experience
Pacific Highlands Ranch Reclaimed Waterline
CITY OF SAN DIEGO 1 SAN DIEGO, CA
Project Surveyor who provided preliminary planning, alignment studies, aerial
topography, final design, easement acquisitions, traffic engineering, construction
surveying and construction management services for two miles of 30 -inch to 12 -inch
recycled waterline within Carmel Valley Road and south across SR -56. One and a half
miles of the pipeline is located within the existing Carmel Valley Road and included
two crossings of SR -56. The project involved coordination with City and Caltrans staff,
four connections within Caltrans right-of-way, Caltrans encroachment permits, and a
pressure reducing station.
On -Call Surveying
PADRE DAM MUNICIPAL WATER DISTRICT 1 SAN DIEGO, CA
Performed on more than 45 task orders involving surveying projects new and existing
water facilities. The process for this on -call project was to receive a task order, review
plans and prepare a detailed cost proposal. The proposal was then reviewed with
Water District's contract to insure all necessary tasks items and deliverables were
clearly understood. Our field crews and supervisors worked closely with the Districts
project team to efficiently perform all tasks and submitted documentation in the proper
format as required. Tasks included cost estimating, design surveys, construction
surveys, as -built surveys, and the preparation of plats and legal descriptions.
San Vincente Dam Raise
SAN DIEGO COUNTY WATER AUTHORITY 1 SAN DIEGO, CA
Performed a detailed topographic as -built survey of the excavated abutments for a
117 -foot dam raise of an existing 220 -foot structure. Terrestrial laser scanning was
used to collect surface detail not obtainable by using conventional methods, point
clouds were registered to the project coordinate system and ASCII point data was
extracted and delivered to the client.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 21
QUALITY ASSURANCE/QUALITY CONTROL
QUALITY ASSURANCE PROCEDURES
Our design quality assurance program was developed
bearing in mind an agency's control over a project outcome
decreases, and the cost of fixing a design problem
increases exponentially over time, as shown below:
160
140
120
100
80
60
40
20
0
44' Sic a�� o0 0� oo cue
as 0 ok.Oa OP Oe 0`a �v� �Jd .0
co,
co,
4 3 eo ,,o
■ Relative Cost of
Fixing Problem
(% of Bid Price)
■ Realistic Client
Control over
Desired
Outcome (%)
A review of the graph above should show the obvious.
The most effective quality assurance programs focus on
activities at the beginning of the design effort rather than
waiting to -the end, when little budget still remains.
To this end, our six -point Quality Assurance Program has
been developed around the following imperatives.
1. Proactive listening to clients. The first step toward
quality is to make a concerted effort to listen to people
throughout your organization to gain a clear understanding
of what you need and want. This requires:
a. Researching in advance standards published on
client websites or elsewhere to gain a thorough
understanding of client expectations
b. Directly asking managers, engineers, operators and
other stakeholders throughout your organization what
they need, want and expect in the delivered product
c. Preparing and submitting opinions of probable cost
at the earliest possible milestone, preferably the
kickoff meeting, to assure budgets and expectations
are compatible
d. Documenting findings in meeting minutes or similar
documents to provide clients with an opportunity to
promptly correct or clarify misunderstandings
2. Utility and subsurface structure research. To design
buried improvements, accurate location and plotting of
utilities and substructures is critical. This requires:
a. Obtaining record maps from utilities identified
through inquiries to Underground Service Alert plus
utilities, such as Caltrans or railroads, who do not
subscribe to Underground Service Alert
b. Critical review of record drawings to note possible
existence of other buried facilities, including thrust
blocks, vaults, and bridge piles, which rarely appear
on record drawings
c. Addressing comments received from Utilities after
their review of preliminary plans showing record
drawing information
d. Field reconnaissance and plotting of locations of
visible surface features, including manhole covers,
valve covers, utility boxes, marking posts, pavement
repair strips, and culvert end sections, which might
indicate presence of other buried utilities
3. Constant learning. While our project teams bring
together professional engineers with decades of
experience, project team members are still encouraged
to set aside time to improve skills and keep skills current.
This includes participation in Greenbook committees as
well as monthly review of changes to codes and standards,
and updating standard templates used to produce
engineering calculations, designs, specifications, and cost
opinions. In addition, in-house training is encouraged to
promote development of skills at all levels of design.
4. In-house specifications templates. To streamline
production as well as to systematically document lessons
learned in an accessible format, we maintain a library of
approximately 600 standard specifications "test-driven"
on hundreds of previous projects and reviewed by public
agencies. Some of these were the basis for sections of
the regional Standard Specifications for Public Works
Construction (Greenbook). Most incorporate not only
direct experience but indirect lessons learned by reverse -
engineering other regional and agency standards.
5. In-house calculation and 'design checklist templates.
To facilitate engineering thoroughness, standard
calculation procedures documented in AWWA manuals
and other engineering references have been automated
through Excel spreadsheets to enable our engineers to
promptly quantify safety factors against many engineering
failure modes. The calculation templates also produce
job -specific quality -control checklists we use to monitor
conformance of Contract Documents to industry standards
as well as your expectations.
6. Two -engineer rule. To bring a team approach to
problem -solving and avoid the danger of blind spots, our
engineering deliverables are reviewed by two licensed
engineers to assure a second set of eyes reviews all work.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 22
REFERENCES
REFERENCES
Provided below are references of clients for whom engineering services have been performed in the last five (5) years that
are comparable in quality and scope to that specified in this RFP.
CITY OF RANCHO
PALOS VERDES
Elias Sassoon
Public Works Director
310.544.5335
esassoon@rpvca.gov
Relevant Project:
Rolling Hills Sewer Connection
Concept Design
(January 2020 -Current)
Key Personnel:
Jeff Cooper, Vanessa Paneto
City of
Santa Monica
CITY OF SANTA MONICA
Tom Shahbazi
Project Manager
310.458.8721 Ext.2355
tom.shahbazi@smgov.net
Relevant Project:
Non -Potable Water Main Expansion
(April 2019 -Current)
Key Personnel:
David Maher, Khanh Nguyen, Nhan Ly
CITY OF SANTA ANA
Armando Fernandez
Senior Civil Engineer
714.647.3316
afernandez@santa-ana.org
Relevant Project: Flower Street, 17th
Street and Greenleaf Street Sewer
Main Improvements
(March 2019 -Current)
Key Personnel:
David Maher, Khanh Nguyen
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 1 23
CITY OF ROLLING HILLS
8 -INCH SEWER PORTUGUESE BEND PROJECT
PROJECT SCHEDULE
o
1
x
-i
s
_
7
e
-e
-10
fr
-ie---65%
14
- t5
-54-
- /0
la
ie
4o
21
--.h-
n_
27
70
00
Tes* rlenw I 02,22401._ san� ;Irian
0o- a. um
Jul - w 8ev
w.. vma
op I otc
ar 1. msl
.m" I can I M.t
w z. zaxl
02.-1...--M01 M
w a. 2021
du I cw Sep
_ oa _!
Notice to Proceed • 0 days Mon 8/3/20 Mon 8/720
1I I
Teak 1 Project Management and Administration + 35 days Mon 81720 Fd 911820
Task 1.1 Project Nick -Off Meeting + 0 days' Fri B/720' Fri 8/720
I I
_ Task 1.2 CEOA Process Overview - -- - -4 wks Mon 8/1020` - Fri 9/420
1 1
Task 1.3 Utility Research .4 4 wk.,' Mon 8/1020 Fri 9/420
I1
Task 1.4 Project Schedule Reards F 8 wks Mon 811012 i Fri 911820
{ - !_
Task 1.5 Research, Survey, and Base map Preparation 2 wlw' Mon 8/320 Fri 8/1420
1 . I.
Stakeholder Meeting t 1 day Fri 8/720 Fri 81720
1
City Council Meeting - - - - Ida Wed 8/520 - Wed 0/520
Tankn2arDesign (Plans, Spectca0ons and Cost 1137 days? Mon 92820 Tue 4/821
Esti e
T
en 46
Mock.to Prot*
leak 1
1 Cone c m.nl.ne.emnkb•uen
�•
b7.
Took 1.1 Noise akk.Of
MMtrQ
-r
0/10 7:,
10421,2 CE
Pre.. owrHw •
I
'
eno
- 1.81S/11.3 MIL
-
1144•10011e
-
1.4 MW
Peeled Scn . Rwre n.
Took
I M `''�' re.0 to Rnrrcn, surnY•m0
aw.nwP h•pr•Wn
1
I 1000.mH4.r t.0.uno
I
as I cln Councilk%.nro
�.
0.000O81sn p•kn., ay.dk•0e..
•.e c..I B.nme•1
.N
Design Review with Staff . l day Man 92820 Mon 9/28/20
JI
1
1 10w4n
0.•t•w 2400Mal
•
65%PSBE--.-
6w Mon92820 _ Fri 11/020
I
a5% P550
City Review
3wks Mon 11/820 Fri 112720—I
BSA elN awkw
Design Review with Staff -
1 day Mon 1113020 Mon 1113020
0.olen R.e1Pe
0 Mall
90%PSBE
---'--
Swk�s Tue 121/20 Mon 1/4/21
' 00,00,1112“a
. """ ..•. . 114
90%Ci/yReview -
3wk0- Tue1/5211 Mon 12521
/
I -
to% n
con .e/
. Ba .'�
100%PSBE
-100%
3 wks• Tue 12621 Mon 211521
I
1
City Review'
• 3wksi-- 72/16211 Mon 7/821
I I
100%cey a•n•..
Final P58E
1 day? Tue 7/9211 Tue-3/921
/
Permitting and Regulations
12 wks Tue 12/120 Mon 28221
-..Ij. I
PmlN ern, R ern,
w
Bid Support
4wkm Wed 3/10/21 Tue
Bb support
Task 3 Construction Phase
.Il..
90 da_ysi Tue 4/6/211 Tae ei1o121
a'
T..a a t.n.l.enlan Pc.
•
, o
Task 3.1 Pre-ConsWcdon Meeting
-
0 days Tun 4/021- Tue 4/621
_
. N
- Task 3,3 Construction Phase
Task 3.4 Provide "Project RecordGrowing" ..a.--...''. 2
16wksi Wed 4/721' Tue 72721
w Wed 72821 Tue 8/1021
II
TonfAConobunbn Pneo
s _ ;. fi
y.�
Task 04ProH4•-NAM nw
040nMn0 E:`.'1,>.: f 2110
SCHEDULE + SCHEDULE CONTROL
WORK BREAKDOWN STRUCTURE
Upon issuance of a notice to proceed, our project manager
will meet with team members to review the requirements,
prepare a Work Breakdown Structure and make team
assignments for maximum efficiency of resources. The
detailed WBS will describe all of the work tasks necessary
to complete the project. A master project schedule will
be prepared following the WBS to show the relationship
between tasks, the expected start date and duration
for each item. This schedule will serve as a guide to
conducting and monitoring the progress of the work and
to assure projects are completed on time and within
budget. To assure accurate monitoring and tracking of
documents, revisions and progress, a document tracking
and control system will be developed. NV5 will meet with
the City's project representatives regularly and maintain
constant communication to assure successful and timely
delivery of the project. Meeting minutes will be distributed
within one week of the meeting, identifying actions, items,
assignments and due dates.
COST CONTROL
We are able to continually review and evaluate a project's
cost through all project phases to enable informed and
timely decision -making by our clients and the entire project
team. Cost control techniques include: program budget
analysis; value engineering; life -cycle cost analysis; and
quantity -based estimating. This budget confirmation
process starts in the earliest stages of the project, when
design and engineering alternatives have the greatest
potential impact on costs. Our design teams analyze
client goals, technical requirements, alternative building
concepts, construction costs and long-term operational
costs to define the optimum scope within the budget,
assuring long-term flexibility and value.
SCHEDULE CONTROL
The key to effective schedule control is to measure actual
progress and compare it to planned progress on a regular
basis and to take necessary corrective action immediately.
We propose to supplement each major task as identified in
the master project schedule with a supplemental schedule
to keep careful track of where each individual component
stands. We identify problems that may result from delays
and readily provide the opportunity to modify the schedule,
as required. This process assures the completion of your
projects on schedule.
MANAGING RESOURCES
NV5 will meet with City project representatives regularly
and remain in constant communication to assure
successful and timely delivery of the project. Bi-weekly
meeting agendas, if necessary, will be distributed at
least two working days before each meeting. Meeting
minutes will be distributed within one week of the meeting,
identifying actions, items, assignments and due dates.
Utilizing this technique will assure consistency in decisions
and will provide a concise list of tasks to be accomplished
by each participant and a specific time schedule to
complete the task.
Senior staff will meet with assigned project personnel
regularly and remain in constant communication to
assure successful and timely delivery of the project.
Utilizing this technique will guarantee adequate technical
support, thorough review and analysis of project issues,
consistency in decisions and recommendations, and will
provide a concise list of tasks to be accomplished by each
team member and a specific time schedule to complete
the task. This constant communication, in conjunction
with in -person meetings, allows our staff to meet project
milestones.
INNOVATIVE AND SUCCESSFUL APPROACHES
The NV5 team focuses on providing safe, cost-effective,
reliable and sustainable improvements using innovative
design and contracting techniques that meet the needs
of the taxpayers, meet or exceed the minimum standards
based on design improvements, and minimize impacts to
adjacent properties and vehicular and pedestrian traffic.
Our experienced engineering staff provides lower -cost
or lower -impact alternatives in order to develop the least
disruptive and least expensive designs.
Our team utilizes the latest in civil engineering design
software to facilitate timely, efficient and innovative
engineering design solutions for our clients. We rely on a
host of computer resources, which includes up-to-date,
state-of-the-art technology that is in use today throughout
the engineering industry. We make maximum use of PC -
based CADD systems that allow for the storage of typical
details, establish similarity of plan layouts, and enable
rapid duplications for the efficient preparation of plan
sheets.
• Our team also provides construction management for
public works projects to several local agencies. We take
our commitment to building innovative projects seriously,
and will have our in-house construction management
staff review plans and specifications for constructability.
This is a good opportunity to obtain the view of those
from the field and reduce potential difficulties that may be
encountered during the construction of a project.
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5 1 25
FEE SCHEDULE/COST PROPOSAL
FEE PROPOSAL
The Fee Schedule/Cost Proposal is in a separately sealed envelope.
City of Rolling Hills I 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road NV5 126
FEE SCHEDULE/COST PROPOSAL
FEE PROPOSAL
The Fee Schedule/Cost Proposal is in a separately sealed envelope.
City of Rolling Hills I 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road . NV5 126
FEE SCHEDULE/COST PROPOSAL
CITY OF ROLLING HILLS
11 V 5 FEE PROPOSAL
8 -INCH SEWER PORTUGUESE BEND/ROLLING HILLS ROAD INSTALLATION
TASK / HOUR BREAKDOWN
Task
NO.
PROJECT
DIRECTOR - QA/OC
$175
PROJECT
MANAGER
$160
PROJECT
ENGINEER
8120_
CADD
DESIGNER
8110
ADMINISTRATION
$90
SUB -
CONSULTANTS/
EXPENSES
TOTAL
HOURS
TOTAL
FEE
HOURS
$
HOURS
$ _
HOURS
$
HOURS_
$
HOURS
$
$
1
Project Management and Administration
0
$0
0
• $0
0
$0
0
$0
0
$0
$0
1.1
Project Meetings and Coordination/Progress Report
and Public Meetings
1
$175
6
$900
12
$1,440
4
$440
1
$90
24
$3,045
1.2
CEQA Process Overview
0
$0
0
$0
0
$0
0
$0
0
$0
$3,825
0
$3,825
1.3
Utility Investigation and Coordination
0
$0
0
$0
2
$240
4
$440
1
$90
7
$770
1.4
Project Schedule Records
0
$0
2
$300
2
$240
0
$0
0
$0
4
$540
1.5
Research of Existing Information, Survey, Base Map
Preparation
0
$0
2
$300
6
$720
16
$1,760
2
$180
$9,561
26
$12,521
Sub Total Task 1
1
$175 _
10
$1,500
_22__
$2,640
24
$2,640
4
$360
61
$20,701 1
2
Final Design and Bid Documents
0
$0
0
$0
0
$0
0
$0
0
_
$0
_$13,386
0
$0
2.1
65% Submittal Package (PS&E)
1
$175
4
$600
28
$3,360
48
$5,280
1
$90
82
$9,505
2.2
90% Submittal Package (PS&E)
0
$0
2
$300
16
$1,920
36
$3,960
2
$180
56
$6,360
2.3
100% Submittal Package (PS&E)
1
$175
2
$300
12
$1,440
24
$2,640
2
$180
41
$4,735
2.4
Final Submittal Package (PS&E)
0
$0
2
$300
2
$240
6
$660
2
$180
12
$1,380
2.5
Permitting and Regulations
1
$175
4
$600
16
$1,920
6
$660
2
$180
29
$3,535
2.6
Bidding Support
1
$175
6
$900
0
$0
0
$0
1
$90
8
$1,165
Sub Total Task 2
4
$700_
20
$3,000
74
$8,880
120
$1.3,200
10
$900
$0
191
$26,680
3
Construction Management
0
$0
0
$0
0
$0
0
$0
_
0
$0
0
$0
3.1
Construction Support
1
$175
8
$1,200
24
$2,880
8
$880
2
$180
43
$5,315
3.2
Record Drawing Preparation(As-Builts)
0
$0
2
$300
0
$0
8
$880
0
$0
10
$1,180
Sub Total Task 3
1
$175
10
$1,500 _
24
$2,880
16
$1,760
2
$180
$0
281
$6,495
Miscellaneous Ex•enses
GRAND TOTAL
6
$1,050
40
$6,000
120
$14,400
160
$17,600
16
$1,440
$13,386
533
$500
$54,376
1
Optional - CEQA IS/MND
$0
$0
$0
$0
$0
$26,820
0
$26,820
City of Rolling Hills 1 8" Sewer Main along Portuguese Bend Road/Rolling Hills Road
NV5