Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Poppy Trail Land Movement March 2005 Utilities
fig • City m/iett JUL • INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 E-mail: cityofrh@aol.com January 19, 2006 State Water Resources Control Board Division of Water Quality Attn: Storm Water Section P.O. Box 1977 Sacramento, CA 95812-1977 SUBJECT: SUBMITTAL OF NOI FOR LANDSLIDE EROSION CONTROL AND TEMPORARY ROAD CONSTRUCTION To Whom It May Concern: Please find enclosed a Notice of Intent (NOI) and the fee for a project in the City of Rolling Hills. Should you have any questions or require additional information, please do not hesitate to call me at (310) 377-1521. S.ncrely Y' Santa Schwartz Panning Director cc: Ross Bolton, Bolton Engineering Sean Lee, Water Resources Control Engineer tinted an Recycled Paper 1� PAY CITY OF ROLLING HI. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CA 90274 BAY CITIES NATIONA Peninsula Branc 395 Silver Spur Roa Rolling Hills Estates, CA 90274 90-3927/1222 NUMBER 18126 **************** Two Hundred,Eighty-Four and 00/100 ***************** TO THE ORDER OF State Water Resources Control Division of Water Qualit P.O. Box 1977 Sacramento, CA 95812-197 DATE Jan 23 06 AMOUNT $284.00 /VP 19 er J`� FrGa IVP AUTHORIZED SIGN URES 61P, RP M? II.OLaL2611' 1:L22239270i: 003 04200611' CITY OF ROLLING HILLS State Water Resources Control s61 INVOICE NO NOI GROSS AMT DISCOUNT 0.00 NUMBER 18126 Jan 23 06 NET 284.00 to Audited and approved for payment : 284.00 CITY OF ROLLING HILLS State Water Resources Control s61 INVOICE NO NOI GROSS AMT DISCOUNT Audited and approved for payment : NUMBER 18126 Jan 23 06 NET 284.00 284.00 207 AUTHORIZED U ✓ - W SAFEGUARD. LITHO USA SFSL1 CK7S08111L M04SF030767 • State Water Resources Control Board Attachment 2 NOTICE OF INTENT TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY (WQ ORDER No. 99-08-DWQ) I. NOI STATUS (SEE INSTRUCTIONS) MARK ONLY ONE ITEM 1. .g New Construction 2. 0 Change of Information for WDID# Name C t ' E Y c5 4= Rr51_ Li P.1 C. LA t t_. .5 Contact Person 1 C iv r ,1 G I -la -Po-- S Mailing Address z PC, _-rvC:iu ED�,-i Roo. Title C t -r - cN.Ap.t�>�C.=. City Lt- I► --I 6 H 1 t✓LS Stat ti"'. Zip C 0Z-7 14 Phone (31 O )--11 - 15 2 1 r C 1,1 t L --fJ Go 1.4 ECR LTC f, -1 E 1.1 c t LI EEI�i ICI G (Ja z P Contact Person � } T"\CoS 5 1._--(-* 44 Mailing Address 707 511 —"\/EIS 3t 'u RD "•ZC•I1 Title F•tr •0J E.CT . �� U t 14E.Ei-R. City P. e`t- L_ t v i--(, L_L- 'E S -T- . Stat c to Zip `'i cN z-7 y Phone (31 C) .5 y - Cz c,1, IV. CONSTRUCTION PROJhC I INtUNMJk 1 ION Site/Project Name 1✓ t...el LQ V c,....4 L-( L Aea D 5 i t P t•✓ -E-R- Site Contact Person Rc.: Sj fi-. L21 --O e.4 S t c Lori i R..=. -t._. rV':1) l G r i 1'd1-t�CX-- f (c,F T-) Physical Address/Location Pc\>p'( —FRf�lL_ \,' c END Latitude 33.'7(r° Longitude 16;34° County LOs /.t-tc=kL'5 City (or nearest City) 0LLI N4 (V -\(k__LS Zip cci_,21`i Site Phone Number ( ) d'\. c•-•0•-1 Emergency Phone Number (AID )3'7 7 - I5Z1 A. Total size of construction site area: 1 \,r`7 5 Acres C. Percent of site imperviousness (including rooftops): _ Before Construction: ' -: ' % D. Tract Number E. Mile Post Marker: s): Pere-• 1.-- 3 L /aCA 5-1 k • A. B. Total area to be disturbed: - t , y g Acres (% of total 13 /) After Construction: I • % F. Is the construction site part of a larger common plan of development or sale? G. Name of plan or development N.t ' r ,f�. P i' L 1 C rsZ7t_ L • YES Ek NO H. Construction commencement date: 9 / I / -2__..C.3.5" J. Projected Complete grading: construction dates: 1 . / ( / .-Z- -S--Complete project: 14 / 1 /'z•(t4., c I. % of site to be mass graded: (3 to K. Type of Construction (Check all that apply): 4. S Reconstruction Other (Please List): 1. • Residential 2. ■ Commercial 3. • Industrial 5. ■ Transportation 6. • Utility Description: 7. ■ ifND BILL TO: OWNER (as in II. above) Name Contact Person ❑ DEVELOPER (as in III. above) Mailing Address Phone/Fax City State Zip III OTHER (enter information at right) VI. REGULATORY STATUS A. Has a local agency approved a required erosion/sediment control plan? 0 YES ❑ NO YES 0 NO Does the erosion/sediment control plan address construction activities such as infrastructure and structures? Name of local agency: C t Tom(' pt= �CL� 1ttG, 4-! tLLS Phone: (3{^) 3 - I SZ E B. Is this project or any part thereof, subject to conditions imposed under a CWA Section 404 permit of 401 Water Quality Certification? ❑ YES Z`NO If yes, provide details: VII. RECEIVING WATER INFORMATION A. Does the storm water runoff from the construction site discharge to (Check all that apply): 1. 2. 3. 71. Indirectly to waters of the U.S. Storm drain system - Enter owner's name: Directly to waters of U.S. (e.g., river, lake, creek, stream, bay, ocean, etc.) B. Name of receiving water: (river, lake, creek, stream, bay, ocean): 1 nt e.1,,, r"fei7 T2t C. 0.4 DT L tar rt n�v f o s r1_S - VIII. IMPLEMENTATION OF NPDES PERMIT REQUIREMENTS A. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) (check one) ❑ A SWPPP has been prepared for this facility and is available for review: Date Prepared: / / Date Amended: _I / A SWPPP will be prepared and ready for review by (enter date): 3 / I / 0 A tentative schedule has been included in the SWPPP for activities such as grading, street construction, home construction, etc. B. MONITORING PROGRAM A monitoring and maintenance schedule has been developed that includes inspection of the construction BMPs before anticipated storm events and after actual storm events and is available for review. If checked above: A qualified person has been assigned responsibility for pre -storm and post -storm BMP inspections to identify effectiveness and necessary repairs or design changes AYES ❑ NO Name: \05_S �7f✓LTC1►mil Phone: (3 )j 444-(vC]1-o C. PERMIT COMPLIANCE RESPONSIBILITY A qualified person has been assigned responsibility to ensure full compliance with the Permit, and to implement all elements of the Storm Water Pollution Prevention Plan including: 1. Preparing an annual compliance evaluation ,4 YES ❑ NO Name: t' S S 7)t L To Phone: (3 (a) E `it — cp 2. Eliminating all unauthorized discharges YES 0 NO IX. VICINITY MAP AND FEE (must show site location in relation to nearest named streets, intersections, etc. Have you included a vicinity map with this submittal? 1Ek YES ❑ NO ELYES 0 NO Have you included payment of the annual fee with this submittal? X. CERTIFICATIONS "I certify under penalty of law that this document and all attachments were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. In addition, I certify that the provisions of the permit, including the development and implementation of a Storm Water Pollution Prevention Plan and a Monitoring Program Plan will be complied with." Printed Name: Signature: Title: tC--T tts6t t�trs✓ tZ Date: j ►.i . 1 s) zoCf OVicinity Map Emergency Land Slide Erosion Control And Temporary Road Poppy Trail Road Rolling Hills, California COX COMMUNICATION • 05.35.24 III 01-17-2006 1 /3 43 Peninsula Center Rolling Hills Estates, CA 90274 310-265-5800 310-544-2546 - FAX To: Fax: j/ 9 SS/e-/-- 6 Re: D�o" From: f� �J Pages: Date: CC: /7 0 Urgent ED -For Review ©-Please Comment 0 Please Reply 0 Please Recycle e Comments: !l 01-17-2006 05-3535 a.m. COX COMMUNICATION 310 544 2546 COST ESTIMATE BLANK POPPY T11A1 RELOCATION Mnlr !sigh Gain Dual Unbalanced Triple STD Line E4kinler • OLE LE Reverse Kit Power Supply • Pn.eary Power Supply • Secondary Power Insane, 8 Amp Cramp 7 way Spline, 3 way Spline. OC•13 CC• 17 In sine EQ's 2 Pon Taps 4 Pon Tape N P01 Tap% Electronics Subtotal T0-, 6 F,41ght 0 Elet1r0n1Ce Total Co.xulors 'Express Splices • Express Co -motors • Teener Splices • Feeder 93'100 Cegree CCn700t0r5 &foream Connectors HSG to HSG Connectors Tap Pon Tormmators Housing Terms Connectors SIiIOtaI Tax d Freight C Connectors Total Ground Roo b Ha'dware St rink Boor Fsoress Shrink Rood Fencer Power apply Rleer 2' Conduit ,90.6Ol,u 3' conduit. 9D's. Cpl's Amp Pedellai LE Pedes01 Passive Pedestal Toy Pedestal Drop Pedestal Vaults 13'024'012' hardware $0010121 Tax & Freight Herdwre Total Cade • .860 CIC Cddo• 540CIC Cade Subtotal Tax & Freight 0 Cab. TOW Total Materials !Pales Verges N Norman Coo P., Unit 0008.00 000 3040 sex. 00 D.03 $000 $09700 0.00 30.00 035800 000 10.00 sY00 000 50.00 0200900 000 30.00 0104300 300 1040 Ma 08 0.0D 1000 027.1s 0.0o 1040 330.20 0.00 1000 $20.10 0.00 $000 $20.10 0 03 soon 526.24 0.03 3040 012.17 0.0D 4000 312.99 7.00 $25 90 323.42 0.00 3000 750 MR: Ring Ring 0-11.2000 Quantify Cost 10% 625.0$ 02.60 625.56 012 17 0 03 0040 $15.53 000 1000 56.36 1103 324.24 $9 BB 0.00 4000 319.00 003 4000 319.1E 000 00.00 $2.75 0.00 3000 5366 C00 10.00 SJ30 GOO 30.00 10% $24.24 $2.42 610.68 $91C 000 30.D0 01.50 7 DC 43.00 S1.32 C00 50.00 07998 000 50.03 10 34 1 000 00 000.00 50 9G 3 00 50.00 510509 000 50.03 0121.59 000 50.03 121.10 000 50.03 027.16 000 50.03 $1001 200 _ 10.00 1.6700 200 161.06 10% 0407.66 040.76 $00.32 SO 30 $026 1.000.00 000 500.01 000 10% $0040 SO110 $90.00 1,033.36 Contract Labor Cost Per Ouenllty Cost Foot/Link Per MIN Per Mlle Trenching Install Cade !Wall Power Supplies Splicing Forwar0 Swoop Ravens Sweep 10151311 Vaults 2'x3' Install Vaults 13.024' Total Contract Labor Engtneanna BasivSnen0/As•Duili Design Make Ready EGR Power Supply Permit Make Heady Foes Excavation Permit Traffic Control Pormil County Inspecton Faq Total Engineering Labor :.)'.11,1J 51; G^.1ll: 40.00 1230.00 390040 41.15003 0.OD 10,00 10.45 500.03 0225,00 30.10 0.00 30.00 30.05 0.03 30.00 $120.0D 0.00 $0.70 140.00 300 $100.00 $19.305.00 Cott per toot COSI Per Quantity COOS FootUn0 Par MIM Per Mlle SO 06 0.00 00 CO 30.02 0.00 1000 40.00 000 50 00 $170 00 0.00 00 00 $0.00 0.00 S000 51,330.00 0.00 4000 S000 000 $000 $70.00 COO 50.00 $0.00 Total Contract Labor 515.306.00 Total 0letetlele 91,053.56 Grand Total 616,350.66 CPU $6000.86 THIS. ESTIt1)t.7o 1S CIA9OG 014 Ix DC!!4 : ALL 70000 INvl1121140 THENCfriItrS P021111E P150115014' 10000 $TRFET COX COST 1F' THE5CU!:; 1111114 OY 'OTHERS W01.11.0 OE=$;! F.r. N 14 ;!.11.20'•.17 COX COMMUNICATION • 05-35 56 a_it 01-17-2006 3 /3 Poppy Troll Restoration Cost Estimate Revised 1-16.6 High Gain Dual Unbalanced Triple BTD Line Extender - BLE LE Reverse Kit Power Suppty - Primary Power Supply - Secondary Power Inserter & Amp Clamp 2 way Splitter 3 way Splitter DC - 8 DC - 12 In Line EO s 2 Port Taps 4 Port Taps 8 Port Taps Electronics Subtotal Tax & Freight C. Electronics Total Connectors -Express Splices - Express Connectors - Feeder Splices - Feeder 90/180 degree Connectors Extension Connectors HSG to HSG Connectors Tap Port Terminators Housing Terms Connectors Subtotal Tax & Freight Connectors Total Ground Rod & Hardware Shrink Boot Express Shrink Boots Feeder Power Supply Riser 2' Conduit ,90,cptrs 3' conduit, 90's, cples Amp Pedestal LE Pedestal Passive Pedestal Tap Pedestal Drop Pedestal Vautls 13-x24'x12' Hardware Subtotal Tax & Freight glO Hardware Total Cable - .860 CIC Ca0le - .540 CIC Cable Subtotal Tax & Freight Cable Total Total Materials Palos Verdes N.Newman Cost Per UNt 750 MHz Ring Ring Contract Labor ouanthy Coat 5688.00 0.00 50.00 5864.00 0.00 50 00 5887.00 0.00 50.00 5358.00 0.00 SD.00 50.00 0.00 50.00 52.009 CO 0.00 50.00 51.043.00 0.00 50.00 564.48 000 50.00 521.15 0.00 50.00 530.20 0.00 50.00 526.16 0.00 50.00 526.16 0.00 50.00 526.24 0.00 50.00 512.12 0.00 50.00 512.99 0.00 50.00 523.42 0.00 50.00 10% 50.00 $0.00 30.00 512.17 0.00 50.00 515.53 0.00 50.00 66.06 0.00 50.00 59.88 0.00 50.00 519.00 0.00 50.00 519.18 0.00 50.00 52.75 0.00 50.00 50.68 0.00 50.00 53 38 0 CO 50.00 10% 50.00 $0.00 50.00 59.10 0.00 50.00 51.50 0.00 S0.00 51.32 4.00 55.28 529.98 0.00 50.00 50.34 1.100.00 5374.00 50.90 0.00 5000 5179.89 0.00 50 CO 5121.59 0.00 5000 $27.16 0.00 50.00 527.16 0.00 50.00 518.01 000 50.00 532.28 2.00 564.56 10% 6443.84 344.38 348822 50.50 0.00 0.00 50.26 1,100.00 286.00 10% 286.00 28.60 314.60 802.82 Machine trench dirt 24' Install Cable Install Power Supplies Splicing Place conduit in trench Reverse Sweep Install Vaults 2-x3' Install Vaults 13'x24' Total Contract Labor Engineering Base/Strand7As-built Design Make Ready EGR Power Supply Permit Make Ready Fees Excavation Permit Traffic Control Permit County Inspection Fees Total Engineering Labor Total Contract Labor Total Materials Grand Total CPM Roger. Cost Par Quantity Cost Foot/Unit Per Mile Per Mlle 55.50 510.00 52.805.00 50.60 1.10000 5660.00 51.15000 0.00 50.00 50.45 400.00 5180.00 51.10 580.00 5638.00 50.05 0.00 50.00 3120.00 0.00 50.00 575.00 2.00 515000 Cost per loot 54,433.00 $ 4.76 Cost Per Quantity Cost Foot/Unit Per Mlle Per Mile $0.06 0.00 50.00 50.02 0.00 $0.00 50.00 0.00 30.00 $170.00 0.00 50.00 50.00 0.00 50.00 51.330.00 0.00 50.00 50.00 0.00 50.00 370.00 0.00 $0.00 $0.00 54,433.00 5802.82 $5,235.82 $2,237.53 This estimate cost is on the assumption Cox will be allowed to plat conduit behind support watt prior to baahll being placed. This will be a much maie cost effective way of doing the project. Ne.