none, Easement deed for the installm, Staff ReportsTO:
FROM:
SUBJECT:
DATE:
ea, 06 o&, -/eee4
INCORPORATED JANUARY 24, 1957
NO. 2 PORTUGUESE BEND ROAD
ROLLING HILLS, CA 90274
(310) 377-1521
FAX (310) 377-7288
Agenda Item No.: 4-B
Mtg. Date: 10-12-09
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
ANTON DAHLERBRUCH, CITY MANAGER
CONSIDERATION OF A NEW DRIVEWAY ACCESS AT 9 JOHNS
CANYON ROAD (STONE).
OCTOBER 12, 2009
ATTACHMENTS:
Driveway Plans
September 24, 2009 letter
RECOMMENDATION
It is recommended that the City Council receive and file the request for a new driveway
access at 9 Johns Canyon Road and approve the Traffic Commission's recommendation
in support of the driveway.
BACKGROUND
At its meeting of September 24, 2009, the Traffic Commission considered and supported
a request from the property owner of 9 Johns Canyon Road (Stone) for a new driveway
access. The matter was introduced at the Commission meeting and followed by a field
trip to the site that included the City's Traffic Engineer. The Traffic Engineer had no
objection to the request and location of the proposed driveway access.
DISCUSSION
The Traffic Commission supported the proposed driveway access with standard
conditions including, for example, roughening for equestrians.
NOTIFICATION
The property owner of 9 Johns Canyon and the Rolling Hills Community Association
have been advised that this matter is on the City Council agenda.
FISCAL IMPACT
There is no fiscal impact associated with this action.
CONCLUSION
It is recommended that the City Council receive and file the attached request and
approve the Traffic Commission's recommendation.
AD:hl
•
.l
a
Cry op2 (f n9 JJ�II
September 24, 2009
Dr. and Mrs. David Stone
9 Johns Canyon Road
Rolling Hills, CA 90274
SUBJECT: NEW DRIVEWAY APPROACH
Dear Dr. and Mrs. Stone.
:I 4c rd •O :,\TE;T J%1NUAI\Y 24, 1957
NO. 2 PORTUGUESE BEND ROAD
ROLLING HILLS, CALIF. 90274
(310) 377.1521
FAX: (310) 377.7288
This is to inform you that at the September 24, 2009 Traffic Commission meeting, the
Commission reviewed your request for a new driveway at the above address. The City's
Traffic Commission and Traffic Engineer's scope of review is of thedriveway approach,
visibility of oncoming traffic and compliance with City's zoning regulations. Based on
this review, the Traffic Commission recommends approval of the new driveway approach
subject to the following conditions:
1. Rolling Hills Community Association review and approval is required.
2. The new driveway apron shall be in compliance with the submitted plan, dated
8/25/09.
3. The first 20-feet of the driveway apron shall have a maximum slope of 7%.
4. The driveway apron shall be roughened.
5. There shall be no grading for the driveway, other than removal of the existing
concrete.
6. The existing driveway approach shall be closed off, except that a not to exceed 5-
foot walkway may be constructed to your entrance, and the remainder of the existing
driveway must be landscaped.
Please be advised that this approval is only for the new "driveway approach" and NOT
for the landscaping of the front of the house. Please submit a separate plan to RHCA and
City Planning Department for landscaping review and approval with the appropriate
calculations of the size of the driveway.
Should you have any questions, please do not hesitate to call me at (310) 377-1521.
Si ely
5,DA.,c;(
to Schwartz
1ing Director
® Printed on Recycled Paper
cc: Anton Dahlerbruch, City Manager
Kristen Raig, RHCA Manager
Ric Dykzeul, Landscape Designer
STONE RESIDENCE •
#9 Johns Canyon
Rolling Hills
Areas Existing sq.ft. Purposed sq.ft. Total sq.ft.
Front Setback sq.ft.(50ft from R/W Line) 22,900 sq.ft. ..---'` 22,900 sq.ft.
Total hardscape in Setback 3519 sq.ft. l' 3,380 sq.ft.
% Total hardscape coverage in setback '5.35% 14.80%
Primary driveway
Paved walks in front
i
3,142 sq.ft. 3,036 sq.ft.
377 sq.ft.\ 344 sq.ft. /
sv nut,4)