JH Bryant
17217 S. Broadway
Gardena, CA 90248
Re: 4 Quail Ridge Road North — Final Inspection
Dear Mr. Bryant:
CALIFORNIA (3 1 0) 544-6766 FAX
Thank you for taking the time to meet with Kristen Raig and myself to show us around the
Tanielian's new residence. As requested, this letter is a follow up to our discussion earlier this week
regarding the items that must be completed before the Association can sign -off on final inspection.
The following is a punch list of items that must be completed before the Association can sign -off on
final inspection:
1. Stone on entry columns & chimney must be completed,
2. Exterior Lighting must be installed throughout residence,
3. Locations where exterior lighting was not approved must be capped,
4. Retaining wall along residence must be finished with stucco or stone,
5. Concrete for pool deck and front entry must be poured and completed,
6. Trash yard and pool equipment screening must be completed (please submit rendering of
proposed fencing prior to installation),
7. Asphalt or other approved material must be installed for the driveway, and
8. Landscaping and irrigation must be started**.
** This item does not need to be completed by final inspection. An adequate time frame determined
by the homeowner and inspector will be noted on a correction card and a follow up inspection will
be scheduled by the inspector to verify that the landscaping and irrigation have been completed and
are per the approved plan.
Once all of the above listed items have been completed, please contact to the Association office to
schedule the final inspection.
Please feel welcome to contact me with any questions, comments or concerns you may have
regarding this letter.
Sincerely,
02,
Kathryn Bishop
Architectural Inspector & Administrator
cc: Garo & Yvonne Tanielian
Yolanta Schwartz, City of Rolling Hills
•
Cttyo/Rolling.�✓��
January 8, 2009
Mr. and Mrs. Garo Tanielian
4 Quail Ridge Road North
Rolling Hills, CA 90274
SUBJECT: Geological Excavations
Dear Mr. and Mrs. Tanielian:
INCORPORATED JANUARY 24, 1957
NO. 2 PORTUGUESE BEND ROAD
ROLLING HILLS, CALIF. 90274
(310)377.1521
FAX: (310) 377.7288
We have received the letter from Western Laboratories regarding geological exploration
on your property. Please be advised that the City does not allow any export of soil, nor
stock piling dirt on the property, unless related to construction. Therefore, once the
grading for the access road and drilling are completed, you must place the dirt back on
the affected areas in a manner that it would not cause erosion or drainage issues. The
Code requires that the affected areas be brought back to their pre -excavation conditions,
including landscaping.
If you have any questions or require additional information, please do not hesitate to call
me at 310 377-1521. We appreciate your cooperation in this matter and the letter
informing us of your planned action.
Sincerely
SA+
olanta Schwartz
lanning Director
cc: Western Laboratories
4030 Spencer Street, Suite 101
Torrance, CA 90503
0
Printed on Recycled Paper
01/06/2009 12:28 13103716727
WESTERN LABORATORIES PAGE 01/03
• •
'army Western Laboratories
Geotechnica! Engineering
FAX TRANSMISSION COVER SHEET
Date: January 6, 2009
To: Yolanta Schwartz - CITY OF ROLLING .FALLS
Fax: (310) 377 - 7288
Subject: #4 Ouail Ridge Road North, Rolling Hills
Sender: Ed Castellanos
YOU SHOULD RECEIVE THIS COVER SHEET ALONG WITH (2) PAGES IF NOT,
PLEASE CALL (310) 371-6747.
This facsimile contains PRIVILEGED AND GONF!DENTIAL INFORMATION Intended only for the use of the addressee named above.
If you ere not the intended recipient, or employee anent responsible for delivering it to the intended recipient, you ere hereby notified
that any dissemination or copying of this facsimile is strictly prohibited. If you have received this facsimile In error, please notify this office
by telephone. Thank you.
4030 Spencer Street, Suite 101, Torrance, CA 90503 (310) 371-6747 — FAX (310) 371-6727
01/06/2009 12:28 13103716727
WESTERN LABORATORIES
PAGE 02/03
•
Western Laboratories
" Y Geotechnlcal Engineering
January 6, 2009
Ms. Yolanta Schwartz
CiTY OF ROLLING HILLS
#2 Portuguese Bend Road
Rolling Hills, California 90274
Subject: Garo & Yvonne Tanielian
#4 Quail Ridge Road North
Rolling Hills, California
Dear Ms. Schwartz:
•
As requested, the following information regarding the subject property is submitted. Two (2)
subsurface borings are proposed to be drilled at the subject site as part of our geotechnical
engineering and engineering geologic exploration. A small road will have to be made to
allow the drill rig access to the proposed boring locations. Approximate locations of the
borings and access road are shown on the attached geologic map.
The access road will be made by Mike Drews Construction Company, Inc., on Wednesday,
January 7, 2009. No cut over three (3) feet in depth will be made in association with the
access road.
The subsurface borings are scheduled to be drilled on Thursday, January 8, 2009, by Roy
Brothers Drilling Company.
If you have any questions regarding this fetter, please feel free to contact the undersigned
at (310) 371-6747.
ESTER LABORATORIES
''GE 191
cc: GARO & YVONNE TANiELIAN
#4 Quail Ridge Road North
Rolling Hills, California 90274
4030 Spencer Street, Suite 101, Torrance, CA 90503 (310) 371-6747 — FAX (310) 371-6727
Ch ! 75 Tt• t 1 _. j `'i w`^
/ / J ( J ,•; , , /:_ , .� it [• ;.r �.•t X ft ':.:.••�:` ` .� r, j ,
1 r 1 1 w
1.
\ 1 % \ l l'iciccri. t.,... ‘,..... ,,,,.. ,
�.'•h h i \ ! e t.
06
ti \
+ c i
cr) '41 •,„ ,,_ \ \
,.
\ • -.„. - :.---.7--
.•� N:`,ti, v? .\ \ \ `'`; \ ` , \ \ \ '� ,
-.., \-:/". ' N. - .,C,N .‘: '1/4 \ Civ \ % ..,,.. ,..,:-. . X
l'.:.,s. N ''s"- .\•.' N
a', \ t \ N. \. �, \
1:
' .:::
. 7.
\ \ '.
....'.11:: . " :"..
A„ \\: - .;�:1 •\. N. : .. 1:::::4:
4` . ^lion Engineeri�g. Jack. 200
�� � plan p�c
•
Yoe