Loading...
none, Addition to SFR, excavation fo, Correspondence(310) 544-6222 July 21, 2011 e e.Ro'Lin9 dn. Community oglloaiation cRanako Palos 7E¢ctEs of NO. 1 PORTUGUESE BEND RD. • ROLLING HILLS, CALIF. 90274 ROLLING HILLS JH Bryant 17217 S. Broadway Gardena, CA 90248 Re: 4 Quail Ridge Road North — Final Inspection Dear Mr. Bryant: CALIFORNIA (3 1 0) 544-6766 FAX Thank you for taking the time to meet with Kristen Raig and myself to show us around the Tanielian's new residence. As requested, this letter is a follow up to our discussion earlier this week regarding the items that must be completed before the Association can sign -off on final inspection. The following is a punch list of items that must be completed before the Association can sign -off on final inspection: 1. Stone on entry columns & chimney must be completed, 2. Exterior Lighting must be installed throughout residence, 3. Locations where exterior lighting was not approved must be capped, 4. Retaining wall along residence must be finished with stucco or stone, 5. Concrete for pool deck and front entry must be poured and completed, 6. Trash yard and pool equipment screening must be completed (please submit rendering of proposed fencing prior to installation), 7. Asphalt or other approved material must be installed for the driveway, and 8. Landscaping and irrigation must be started**. ** This item does not need to be completed by final inspection. An adequate time frame determined by the homeowner and inspector will be noted on a correction card and a follow up inspection will be scheduled by the inspector to verify that the landscaping and irrigation have been completed and are per the approved plan. Once all of the above listed items have been completed, please contact to the Association office to schedule the final inspection. Please feel welcome to contact me with any questions, comments or concerns you may have regarding this letter. Sincerely, 02, Kathryn Bishop Architectural Inspector & Administrator cc: Garo & Yvonne Tanielian Yolanta Schwartz, City of Rolling Hills • Cttyo/Rolling.�✓�� January 8, 2009 Mr. and Mrs. Garo Tanielian 4 Quail Ridge Road North Rolling Hills, CA 90274 SUBJECT: Geological Excavations Dear Mr. and Mrs. Tanielian: INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310)377.1521 FAX: (310) 377.7288 We have received the letter from Western Laboratories regarding geological exploration on your property. Please be advised that the City does not allow any export of soil, nor stock piling dirt on the property, unless related to construction. Therefore, once the grading for the access road and drilling are completed, you must place the dirt back on the affected areas in a manner that it would not cause erosion or drainage issues. The Code requires that the affected areas be brought back to their pre -excavation conditions, including landscaping. If you have any questions or require additional information, please do not hesitate to call me at 310 377-1521. We appreciate your cooperation in this matter and the letter informing us of your planned action. Sincerely SA+ olanta Schwartz lanning Director cc: Western Laboratories 4030 Spencer Street, Suite 101 Torrance, CA 90503 0 Printed on Recycled Paper 01/06/2009 12:28 13103716727 WESTERN LABORATORIES PAGE 01/03 • • 'army Western Laboratories Geotechnica! Engineering FAX TRANSMISSION COVER SHEET Date: January 6, 2009 To: Yolanta Schwartz - CITY OF ROLLING .FALLS Fax: (310) 377 - 7288 Subject: #4 Ouail Ridge Road North, Rolling Hills Sender: Ed Castellanos YOU SHOULD RECEIVE THIS COVER SHEET ALONG WITH (2) PAGES IF NOT, PLEASE CALL (310) 371-6747. This facsimile contains PRIVILEGED AND GONF!DENTIAL INFORMATION Intended only for the use of the addressee named above. If you ere not the intended recipient, or employee anent responsible for delivering it to the intended recipient, you ere hereby notified that any dissemination or copying of this facsimile is strictly prohibited. If you have received this facsimile In error, please notify this office by telephone. Thank you. 4030 Spencer Street, Suite 101, Torrance, CA 90503 (310) 371-6747 — FAX (310) 371-6727 01/06/2009 12:28 13103716727 WESTERN LABORATORIES PAGE 02/03 • Western Laboratories " Y Geotechnlcal Engineering January 6, 2009 Ms. Yolanta Schwartz CiTY OF ROLLING HILLS #2 Portuguese Bend Road Rolling Hills, California 90274 Subject: Garo & Yvonne Tanielian #4 Quail Ridge Road North Rolling Hills, California Dear Ms. Schwartz: • As requested, the following information regarding the subject property is submitted. Two (2) subsurface borings are proposed to be drilled at the subject site as part of our geotechnical engineering and engineering geologic exploration. A small road will have to be made to allow the drill rig access to the proposed boring locations. Approximate locations of the borings and access road are shown on the attached geologic map. The access road will be made by Mike Drews Construction Company, Inc., on Wednesday, January 7, 2009. No cut over three (3) feet in depth will be made in association with the access road. The subsurface borings are scheduled to be drilled on Thursday, January 8, 2009, by Roy Brothers Drilling Company. If you have any questions regarding this fetter, please feel free to contact the undersigned at (310) 371-6747. ESTER LABORATORIES ''GE 191 cc: GARO & YVONNE TANiELIAN #4 Quail Ridge Road North Rolling Hills, California 90274 4030 Spencer Street, Suite 101, Torrance, CA 90503 (310) 371-6747 — FAX (310) 371-6727 Ch ! 75 Tt• t 1 _. j `'i w`^ / / J ( J ,•; , , /:_ , .� it [• ;.r �.•t X ft ':.:.••�:` ` .� r, j , 1 r 1 1 w 1. \ 1 % \ l l'iciccri. t.,... ‘,..... ,,,,.. , �.'•h h i \ ! e t. 06 ti \ + c i cr) '41 •,„ ,,_ \ \ ,. \ • -.„. - :.---.7-- .•� N:`,ti, v? .\ \ \ `'`; \ ` , \ \ \ '� , -.., \-:/". ' N. - .,C,N .‘: '1/4 \ Civ \ % ..,,.. ,..,:-. . X l'.:.,s. N ''s"- .\•.' N a', \ t \ N. \. �, \ 1: ' .::: . 7. \ \ '. ....'.11:: . " :".. A„ \\: - .;�:1 •\. N. : .. 1:::::4: 4` . ^lion Engineeri�g. Jack. 200 �� � plan p�c • Yoe