none, Install solar panels, Staff ReportsMEMO TO FILE: MAY11,2018 RE: 7 Caballeros Undergrounding of utility lines: ON 6/17/17 staff approved ground mounted solar panels array at this address. The electrical panel needed to be upgraded and this scope triggered the requirement that ALL Utility lines be placed underground (Sec 17.27.030). The plan has a note to "underground electric". On 5/7/18 Bldg. Dept inspection revealed that work was completed, but one line (COX) was not undergrounded. The inspector asked the Contractor to contact the City. The Contractor -Josh from WEGEN Solar Solution, called the City to inquire why he needs to underground the other line, as it was not clearly stated on the plan what exactly needed to be done. After consideration, it is the City's position that it is the contractor's responsibility to learn City's Codes and that the remaining line needs to be undergrounded as well. Josh was very upset. Josh - 714 471-4519 Yolanta Schwartz, Interim City Manage