none, Install solar panels, Staff ReportsMEMO TO FILE:
MAY11,2018
RE: 7 Caballeros Undergrounding of utility lines:
ON 6/17/17 staff approved ground mounted solar panels array at this address. The
electrical panel needed to be upgraded and this scope triggered the requirement
that ALL Utility lines be placed underground (Sec 17.27.030). The plan has a note to
"underground electric".
On 5/7/18 Bldg. Dept inspection revealed that work was completed, but one line
(COX) was not undergrounded. The inspector asked the Contractor to contact the
City.
The Contractor -Josh from WEGEN Solar Solution, called the City to inquire why he
needs to underground the other line, as it was not clearly stated on the plan what
exactly needed to be done.
After consideration, it is the City's position that it is the contractor's responsibility to
learn City's Codes and that the remaining line needs to be undergrounded as well.
Josh was very upset.
Josh - 714 471-4519
Yolanta Schwartz, Interim City Manage