Loading...
none, Plan only - Topograph survey, Application4 • 41110,-7,3) M ,n 23 2012 City of Rolling Hills By EXPORT/IMPORT OF SOIL UP TO 500 C.Y. OF DIRT MAY BE IMPORTED OR EXPORTED FROM A CONSTRUCTION SITE DUE TO SITE CONDITIONS OR DUE TO UNFORSEEN CIRCUMSTANCES AND ONLY WITH CITY APPROVAL. (RHMC Sections 15.04.130 and 15.04.150) Property Owner(s) ; ►1 l e- GtlVt i P RU1C ka4A—_ Address(es) VI lV l,(LDS6v V Phone No(s). 310 1 5 — ram" l ( Reason(s) for export/import soil. *as construction commenced? Tn pwUi dio i n 1> ADDRESS Where soil is proposed to 6e moved FROM ADDRESS U� �I 1414 s%v►J Where soil is to bye moved TO LJ AMOUNT of soil to be moved (cu.yds.): 100 lip- L'M_ s DEPTH of cut/fill at site (feet) r I AREA of cut/fill at site (square feet) hi( .� J) 'rid [(TA- o ry ,se WORKING AT THE JOB SITE: The City Building Inspector/staff must verify the amount of soil to be moved, and after it has been deposited, the amount of dirt deposited. You must notify City staff should there be deviations or corrections in the field to modify the approved exportation or importation. The Rolling Hills Municipal Code requires that all grading be balanced on site and prohibits the export or import of soil to or from any lot in the City or to and from outside the City unless approved by the Citv Manaaer/designee under certain conditions. I understand and agree to abi •2a• y these requirements. �ZIZ ?—Z3-12 /,u e%— Date L Owner/Ap • i.. nt Date g/ tractor/Applicant's Agent / License No. Date Engineering Geologist/License No. Date Phone No. Grading Contractor/License No. EXPORT/IMPORT OF SOIL DURING CONSTRUCTION 2011 • • APPROVED: DATE l ;' WER OR DESIGNEE CONDITIONS: EXPORT/IMPORT OF SOIL DURING CONSTRUCTION 2011 1 L • • INSTRUCTIONS FOR REOUEST TO EXPORT/IMPORT OF DIRT AFTER CONSTRUCTION COMMENCES (RHMC SECTIONS 15.04.130 and 15.04.150) • Submit the attached form • Submit additional sheets if necessary to detail the project • Submit revised site plan/grading plan/cross sections and any other information necessary to clearly depict the resulting changes on both properties • Staff and/or Building Inspector must verify the amount of dirt requested to be moved • Staff may determine that the request constitutes a major modification to the project and therefore Planning Commission review may be necessary • Staff may determine that the request exceeds staff's authority to approve the request over-the-counter and therefore Planning Commission review may be necessary (Planning Commission review is necessary when a cut or fill exceed 3 feet high or when the activity covers more than 2,000 sq.ft. of surface area) • Building and Safety Dept. review and permit may be required EXPORT/IMPORT OF SOIL DURING CONSTRUCTION 2011