Loading...
none, Correspondence, CorrespondenceCalifornia Natural Resourcesfencv Litt -AK I MI=N I or riH AND -GAME South Coast Region 4949 Viewridge Avenue San Diego, CA 92123 (858) 467-4201 http://www.dfg.ca.gov April 21, 2010 William T. Everett Post Office Box 2468 Julian, California 92036 Subject: Closure of SAA 1600-2003-0077-R5 Dear Mr. Everett: ARNOLD SCHWAtIVEGGER. Governor JOHN McCAMMAN, Director The California Department of Fish and Game has received and reviewed the final monitoring report for the mitigation site at 5 and 6 Sagebrush Lane per Streambed Alteration Agreement Notification #1600-2003-0077-R5. A site visit was conducted on August 26, 2009 to review the site to ensure the construction was completed as described in the streambed alteration agreement and to determine if the mitigation, as defined within the streambed alteration agreement, has met the success criteria, as well as the terms and conditions of our agreement. The Department has determined, based upon this Final Monitoring Report and the site visit, that the terms and conditions were met and that the Department deems the mitigation to be successful. The Department is closing Streambed Alteration Agreement #1600-2003-0077- R5. We thank you for your cooperation in this matter. If you have any questions, please contact Rick Mayfield at (805) 985-5686 or rmayfield@dfg.ca.gov. Sincerely, Rick" Mayfield Environmental Scientist Conserving Ca(fornia s WiI T fe Since 1870 Flux POIYEW" A.G.I. GEOTECHNICAL, INC. 7247 Hayvenhurst Avenue, Unit A-2 • Van Nuys, CA 91406 • (818) 785-5244 • FAX (818) 785-6251 January 28, 1999 Mr. and Mrs. James Hao 30041 Highridge Rancho Palos Verdes, CA 90275 SUBJECT: RESPONSE TO PLAN CHECKER CONCERNS #5 Sagebrush Lane Lot 3, Tract 30345 Rolling Hills, CA Dear Mr. and Mrs. Hao: Project No. 4-1629-23 This report is prepared in response to the concerns of the Plan Checker of the Department of Public Works of the County of Los Angeles reviewing the plans for your project. The Plan Checker's concerns refer to the single drainage terrace included in the repair of the slope failure that occurred below the building pad. To envision a suitable repair plan for the slope, on September 10, 1998, the undersigned met with Mike Montgomery, Scott T. Ezell, and other County personnel at the job site. The recently constructed residence limited the options for repair. After reviewing the site conditions, we presented a recommended slope repair that would improve the conditions of the slope that existed before the failure occurred. Because of the slope gradient and site constraints, the slope repair proposed included a single terrace drain to be located as site conditions dictate. The proposed repair was agreed to by the County personnel that asked that our recommendations be presented in a report. On September 11, 1998, we presented our report. After reviewing the report, Mike Montgomery and Scott T. Ezell requested a seismic analysis of the slope to verify that the single terrace was adequate. We presented our analysis in our report dated September 28, 1998. The two reports, containing a cross section and a map showing the single drainage terrace, were approved by Mike Montgomery and Scott T. Ezell on their review letters dated November 24, 1998. A copy of Engineering Geology • Soil Engineering • Environmental Studies Project No. 4-1629-23 Page 2 each letter is attached. In our opinion, because of the site conditions the single drainage terrace incorporated in the slope repair comply with the intent of the building code. It is our desire that this report gives assurance to the Plan Checker that the designed repair was agreed to by the parties mentioned above. If you have any questions regarding this report, please do not hesitate to contact this office. Respectfully submitted, A.G.I. EOTECHNICAL, IN an • . idal, R. .E. 861 Enclosures: Copy of Review Letters Distribution: (2) Mr. and Mrs. Hao (4) Mr. Michael D. Myers, South Bay Engineering . • • Address: Telephone: Fax: Calling hours 1..JUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS MATERIALS ENGINEERING DIVISION SOILS ENGINEERING REVIEW SHEET 900 S. Fremont Ave. Alhambra, CA 91803 (626) 458-4925 (626) 458-4913 - Monday through Thursday 8-9 a.m. & 3-4 p.m. "As -Built' Grading Plan & Slope Repair Tract 3034F Lot ..5. _ Location 5 Sagebrush Lane. Roilina Hills Developer/Owner Hao Engineer/Architect - SSE Soils Engineer AGI f4-16?91 Geologist _Diem Grading Plan Check No. 970925Q005 Review of: Grading Plan Dated By Processing Center 11/16/98 Previous review sheet dated 9/28/98 ACTION: Plan is approved, subject to conditions below: REMARKS: District Office 1,2.02 Sheet 1 of 1 DISTRIBUTION: j__, Drainage and Grading ,__ Geo/Soils Central File District Engineer ..,_ Geologist ,j„_ Soils Engineer Engineer/Architect 1. Contact the Lomita Building and Safety/Land Development Division District Office in regards to obtaining an additional or revised grading permit for the proposed slope repair. 2. The existing drain located within the landslide shall be relocated. 3. Submit a final grading report to the Soils Section for verification that the completed work complies with County codes and policies. NOTES TO THE PLAN CHFCKE$: 1) IT APPEARS THAT AN ADDITIONAL OR REVISED GRADING PERMIT IS REQUIRED FOR THE PROPOSED SLOPE REPAIR. 2) iF ADVERSE CLAY LAYERS ARE ENCOUNTERED DURING GRADING, THE PROPOSED SLOPE REPAIR WiLL EXTEONLY THE SOILS RECOMMENDATIONS DEPICTED ON THE PLANS ARE APPROVED. Prepared by Scott T. Ezell NOTICE; Public safety, relative to geotechnical subsurface e inclusive of the Los Angeles County Code, Chapter 11.48, and t scott:5 Date 11/24/98 ccordance with current codes for excavations, onstruction Safety Orders. q , s Arneles County Department of Public *ks Sheetl off .TERIALS ENGINEERING DIVISION GEOLOGIC REVIEW SHEET , REVIEWERS CALLING HOURS: 900 S. Fremont Ave., Alhambra, CA 91803 8:00-9:00AM & 3:00-4:OOPM MON-THURS TEL. (626) 458-4925 Thomas Guide Tract/PM 30348 Lot(s)_$._._._ Parent Tract Location Rollin° Hills Site Address La Sagebrush Late Geologist Keith EhlPrt Developer/owner Hao Geotechnical Engineer AGl Geotechnical Engineer/Arch, South Bay En°ineering Review of: .k.Grading P.C. No. 9709250005 Building P.C. No. For: SFR ✓ Geologic Report(s) Dated 7/16/98. 6/29/98. 9/1019R ✓ Geotechnical Engineering Report(s) Dated 7/15/B8. 10/21/96. 1 /30/98. 9/11/98 R/28(9R Action: Dist. Office 12.0Z Fes_ DISTRIBUTION District Office vovfrGeologist L Geotechnical Eng. . . Section Fite Grading Section Process Center Supervisor g_ Plan is recommended for approval with conditions below: Plan is not recommended for approval 1 . Follow recommendations of the consulting geologist ✓ geotechnical engineer. 2. The _,!/ geologist..- geotechnical engineer must make in -grading inspections. Monthly in -grading inspection reports must be submitted directly to the Geology and Soils Sections by the consuttante, 3. Rough grading must be approved by a.._ final geology report final geotechnical engineering report. prior to approval by the Geology and Soils Sections... An As -Built Geologic Map must be included in the final geology report. Submit final report for approval of rough grading by the Geology and Soils Sections for issuance of building permit. Provide a final report statement that verifies work done was in accordance with report recommendations and code provisions (Section 7021-3). include a Section 111 statement in the final report. 4. The Geotechnical Engineering Unit's approval is attached,_ requirements attached, L conditions of approval are attached, approval is required (Review is dated 11 / 24 / 98 ). 5. The consulting engineering geologist (Keith Ehiert) has recommended that drain pipe/yard drain discharges should be diverted away from the subject slope (see report dated 9/10/98). Please make sure this has been done and verify in final geology report (see Item 3 above). Attention Gradino Plan Checker: The proposed mitigation of the recent slope failure may require offsite grading depending upon the geologic conditions encountered during grading. . Prepa Date November 24. 1999 NOTICE: Public safety, r etive to geotachnical subsurfa xploration, shall be provided in accordance with current codes for excavations, inclusive of the Los Angeles Cou y Code. Chapter 11.48, and th • - tate of California, Title 8, Construction Safety Orders. 48-0052 6/22/98 F-RS:Form.6 Ci ofi2li,.y JUL January 29, 1997 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos Verdes, CA 90275 SUBJECT: REVIEW OF "AS GRADED" PLAN 5 SAGEBRUSH LANE (LOT 100-A-3-RH) Dear Mr. and Mrs. Hao: INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 Email: cltyofrh@aol.com We appreciate you providing the "as graded" plan for your development project on the above mentioned lot. We have concluded an initial review of the "as graded" plan and visited the construction site with the County's District Engineer Ms. Lata Thakar and Senior Engineering Building Inspector Mr. Rafael Bernal. The initial review revealed some issues that need to be resolved. These issues are: 1. The original site plan as well as plans approved by the City's Planning Department were approved without any grading. The "as graded" plan shows 1,750 cubic yards of cut soil and 370 cubic yards of fill soil. At the site, cuts were made for a substantial basement and a swimming pool. 2. During the course of construction, Mr. Andrew Glassell, contractor, requested and had approved a request from the City Manager for a maximum of 450 cubic yards of soil to be exported from your property at 5 Sagebrush Lane (Lot 100-A-3-RH) as follows: 130 cubic yards to 7 Maverick Lane (Lot 28-SK) and the rest for repair of the Flying Triangle Landslide Area and the Clif Hix Riding. Ring. The import and export of more than this amount requires the City Manager's approval and if the amount is more than 500 cubic yards of soil, such action requires Planning Commission approval. It appears that much more than 500 cubic yards of soil was exported from your lot and thus, prior Planning Commission approval was required for that action. Consequently, we have determined that your project is in violation of the original plans as presented to and approved by the Planning Commission on January 17, 1995. Therefore, you are hereby ordered to submit to the City in writing how you plan to resolve this situation and bring your property into conformance with the approved project. As an alternative to bringing the site into conformance with approved plans, you are permitted to apply to the Planning Commission for a Variance to disrupt the balanced cut and fill ratio and to allow the existing exportation of the substantial amount of soil. This request would also have to be accompanied by a request to modify your Site Plan Review approval to increase grading quantities. Should you apply for the Variance and Modification to the Site Plan Review and pay appropriate fees, we will consider modifying the stop work order to allow work to continue on ®P' nTed on Recycled Paper • portions of your project that would not preclude the restoration of your property into conformance with the development as originally approved by the Planning Commission. We stand ready to review any proposals you may choose to offer as to what portions of this project may continue without precluding you from returning the exported soil to your construction site should the Planning Commission deny your request. Your decision must be made in writing within the next 15 days (by February 13, 1997) as to your course of action. Should you elect to make application for the Variance and Modification to the Site Plan Review approval, we will make every effort to expedite your applications to their earliest possible conclusions, but you should understand that there is no assurance that the Planning Commission will approve those applications. Thus, it is possible that even after going through the process of applying for the Variance and Modification to the Site Plan Review, you may be required to return the site to its originally approved condition. The "Stop Work Order" for building and grading work remains in effect and you are prohibited from doing any work beyond closure of the septic system during this period. Feel free to call me if you have any questions regarding this matter. Your cooperation will be appreciated. Sincerely, LO LA M. UNGAR r PRINCIPAL PLANNER cc: City Council Planning Commission Craig R. Nealis, City Manager Peggy Minor, RHCA Manager Lata Thakar, District Engineer, Building & Safety Rafael Bernal, Senior Engineering Building Inspector, Building & Safety Michael Jenkins, City Attorney Kevin Ennis, Assistant City Attorney Douglas McHattie, South Bay Engineering Criss Gunderson, Architect Andrew Glassell Dutch Phillips Ciiy o� Ro ttin9 JhN January 9, 1997 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos Verdes, CA 90275 INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377.1521 FAX: (310) 377.7288 E-mail: cityofrh@aol.com SUBJECT: STOP WORK ORDER AT 5 SAGEBRUSH LANE (LOT 100-A-3-RH) Dear Mr. and Mrs. Hao: We have received a letter from your contractor, Mr. Andrew Glassell, Glassell Development Inc., requesting to complete the work on the open septic system while an "as graded" plan is being prepared by South Bay Engineering. We have also received a letter from Mr. Douglas McHattie, South Bay Engineering, regarding the preparation of the plan. At this time, you may only complete work on the septic system. The "Stop Work Order" for building and grading work shall remain in effect and you are prohibited from doing any work beyond closure of the septic system during this period. We are still awaiting a stamped "as graded" plan from you regarding the exportation of a maximum of 450 cubic yards of soil from your property at 5 Sagebrush Lane (Lot 100-A-3-RH); 130 cubic yards to 7 Maverick Lane (Lot 28-SK) and the rest for repair of the Flying Triangle Landslide Area and the Clif Hix Riding Ring. We will continue to work with you to clear up this situation as soon as possible to avoid any unnecessary delays. Feel free to call me if you have any questions regarding this matter. Your cooperation will be appreciated. Sincerely, OC,Q LOLA M. UNGAR PRINCIPAL PLANNER cc: City Council Craig R. Nealis, City Manager Peggy Minor, RHCA Manager Lata Thakar, District Engineer, Building & Safety Rafael Bernal, Senior Engineering Building Inspector, Building & Safety Michael Jenkins, City Attorney Mr. Douglas McHattie, South Bay Engineering Mr. Tom Milostan, Architect Mr. Andrew Glassell, Glassell Development, Inc. it Printed on Recycled Paper. Ci1y `Rollina��e JODY MURDOCK Mayor B. ALLEN LAY Mayor Pro Tern THOMAS F. HEINSHEIMER Councilmember FRANK E. HILL Councilmember GODFREY PERNELL, D.D.S. Councilmember January 2, 1997 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos Verdes, CA 90275 Subject: Request to County for Stop Work Order Dear Mr. and Mrs. Hao: INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 E-mail: cityofrh@aol.com By copy of this letter, we are requesting that the County of Los Angeles issue a "Stop Work Order" for any additional grading and building work on the premises 5 Sagebrush Road. This request follows the City's prior letters, dated December 6 and 17, 1996, asking you to submit "as graded" grading plans for the site showing the exportation of a maximum of 450 cubic yards of soil, 130 of which was to go to the Howroyd property at 7 Maverick Lane (Lot 28-SK) from your lot at 5 Sagebrush Lane (Lot 100-A-3-RH). Those plans were not received by December 27, 1996 as requested in our December 17, 1996 letter. This request to the County is for the County to apply the provisions of the Uniform Building code which allow the Building Official to stop work on a project when there is evidence that the project is not being implemented in accordance with approved plans (Uniform Building Code Section 104.2.4). The City's approval of the project was based upon a site plan that showed no exportation of soil. The City Manager subsequently authorized the exportation of a maximum of 450 cubic yards of soil, in accordance with the authority provided by Section 15.04.150 of the Rolling Hills Municipal Code. We have subsequently received several complaints and reports from citizens indicating that up to 3 times the approved amount may have been exported from your property to the Howroyd's property. Thereafter, we requested preparation of "as graded" grading plans to indicate the total amount of soil exported. Those "as graded" plans have not been forthcoming and has led to the need to stop construction to further evaluate the status of the alleged violation of the approved site plan. ®Punted on Recycled Paper. • • Mr. and Mrs. James Hao January 2, 1997 Page 2 We remain certain that you share our desire to resolve this situation as soon as possible in order to avoid any unnecessary delays and, once again, look forward to your cooperation. If you have any questions regarding this matter, please do not hesitate to contact me. Sincerely, Lola Ungar, Principal P annex' LU:mlk 12/30/96hao.ltr cc: City Council Lola Ungar, Principal Planner Peggy Minor, RHCA Manager Lata Thakar, District Engineer, Los Angeles County Michael Jenkins, City Attorney Mr. Douglas McHattie, South Bay Engineering Mr. Criss Gunderson, Architect Mr. Andrew Glassell • • C1i 0/R0ff Jh/h December 17, 1996 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos Verdes, CA 90275 SUBJECT: EXPORTATION OF SOIL Dear Mr. and Mrs. Hao: INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 E-mail: cityofrh@aol.com We have not received a response to our letter of December 6, 1996 requesting a stamped "as graded" plan from you regarding the exportation of a maximum of 450 cubic yards of soil from your property at 5 Sagebrush Lane (Lot 100-A-3-RH); 130 cubic yards to 7 Maverick Lane (Lot 28-SK) and the rest for repair of the Flying Triangle Landslide Area and the Clif Hix Riding Ring. As we stated previously, we have not issued a "Stop Work Order" during our investigation and do not intend to do so unless you do not comply with our request for an "as graded" plan within the next ten days (by December 27, 1996). We have been very patient and we are certain that you share our desire to clear up this situation as soon as possible to avoid any unnecessary delays. Feel free to call me if you have any questions regarding this matter. Your cooperation will be appreciated. Sincerely, o_eit, 4 LOLA M. UNGAR PRINCIPAL PLANNER cc: City Council Craig R. Nealis, City Manager Peggy Minor, RHCA Manager Lata Thakar, District Engineer, Los Angeles County Michael Jenkins, City Attorney Mr. Douglas McHattie, South Bay Engineering Mr. Criss Gunderson, Architect h ii Printed on Recycled Paper. I. • • City 0/ JODY MURDOCK Mayor B. ALLEN LAY Mayor Pro Tern THOMAS F. HEINSHEIMER Counciimember FRANK E. HILL Counctimember GODFREY PERNELL, D.D.S. Councilmember December 6, 1996 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos Verdes, CA 90275 Dear Mr. and Mrs. Hao: INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX (310) 377-7288 E-mait cityofrh@aol.com As I indicated to you on the telephone, we have received several complaints regarding the exportation of soil from your property in conjunction with the construction of your residence. Reports indicate that up to 10 times above the permitted quantity of soil was exported to 7 Maverick Lane. As you know, exportation of a maximum of 450 cubic yards of soil was approved based upon the attached request. We are currently awaiting receipt of an as graded plan at the Howroyd property, 7 Maverick Lane, so we can compare the as graded condition to the permitted grading that was approved by the Planning Commission. We also require an as graded plan from you. We have not issued a stop work order on your project. However, you should be advised that we are investigating this matter. If our investigations indicate that the conditions imposed on your approval were violated, we may have no choice but to order restorative action. We are certain that you share our desire to clear up this situation as soon as possible to avoid any unnecessary delays. In that light, we anticipate that you and your representatives will provide full and complete cooperation. Panted on Recycled Pacer • • Mr. and Mrs. James Hao December 6, 1996 Page 2 Should you wish to discuss this further, please do not hesitate to call. We will let you know when our findings are complete. Sincly, ola Ungar Principal Planner LU:mlk hao.ltr cc: City Council Craig R. Nealis, City Manager Peggy Minor, RHCA Manager Lata Thakar, District Engineer, Los Angeles County City Attorney Mr. Doug McHattie Mr. Criss Gunderson C4, ol Rolling JUL October 8,1996 Mr. Andrew Glassell 5 Sagebrush Lane Rolling Hills, CA 90274 SUBJECT: BALANCED CUT AND FILL EXCEPTION Dear Mr. Glassell: 411 INCORPORATED JANUARY 24, _ 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377.1521 FAX (310) 377.7283 Emalt cityolrt so&com Thank you for your letter of October 7, 1996. As we noted, Paragraph 3 of Section 15.04.150 of the Rolling Hills Municipal Code permits an exception to the balance cut and fill ratio requirement of up to 500 cubic yards of soil to be exported or imported when a structure cannot be completed without the requested import or export of soil. The export of 450 cubic yards of soil from 5 Sagebrush Lane may be used to finish the Howroyd project at 7 Maverick Lane .(130 cubic yards), the remainder for Community Association road repair and for improvements to the Clif Hix Riding Ring. Please call me at (310) 377-1521 if you have any questions. LOLA UNGA PRINCIPAL PLANNER cc Ms. Peggy Minor, Rolling Hills Community Association Manager, Mr. Roger Vink, RHCA Architectural Inspector Pnnlfd on cyc4 d Piof, October 7, 1996 City of Rollings Hills 2 Portugese Bend Road Rolling Hills, Ca. 90274 CITY OF ROLI imr: HILLS Approved 40 eti PLANNING DEPART NT Re: 05 Sagebrush Lane Dear City Manager, Pursuant to Sect. 7015.4 Paragraph 03; in that the project has been started and that in order to continue the project it is necessary for us to export approximately 450 cubic yards of dirt produced from the 3 sixty-five foot deep seepage pits and extra deep footings, both requir- ed by the County Building Department, we respectfully request that we be allowed to remove the dirt from the site as soon as possible. Sincerely, Andrew Glassell Plcrr w'%l) GE vsFD oR coNµw07.-r‘ fssoc. goat/ cetettie. • • Coy 0/Rottin, JUL JODY MURDOCK Mayor B. ALLEN LAY Mayor Pro Tom THOMAS F. HEINSHEIMER Cotmknember FRANK E. HIU. Cow.? oocFRE.Y PERNELL. D.D.S. Coun#nernber September 20, 1996 Mr. Doug McHattie South Bay Engineering 304 Tejon Place Palos Verdes Estates, CA 90274 Dear Mr. McHattie: INCORPORATED JANUARY 24, 1937 NO.2 PORTUOVESE BEND ROAD ROLLING HILLS. CALIF. 40274 pt3377.1521 FAX ptq 377.7244 Emit dirt Osoi.coo Thank you for your letter dated September 19, 1996 requesting to export 240 cubic yards of soil from the Blazevich job site at 1 Buggy Whip Drive. The letter appears to satisfy the reasons why soil needs to be imported at 7 Maverick Lane and the Hix Ring. However, you have not submitted any evidence supporting the need to export the soil from 1 Buggy Whip Drive as required pursuant to Section 15.04.150 of the Municipal Code (enclosed). Therefore, your request is denied at this time. In order to consider your request for approval, you must comply with the provisions of Paragraph 3 of Section 15.04.150 of the Rolling Hills Municipal Code which provides an exception to the balance cut and fill ratio requirement. Conditions which must be met include: a. construction of the structure on the lot or parcel has commenced. b. that the need to import or export soil could not have been foreseen prior to commencement of construction and c. that either the structure cannot be completed without the requested import or export of the soil or that the emergency condition exists due to the threat of land subsidence or other eminent danger. Until the provisions of Section 15.04.150 are satisfied, and approval is granted by the City, you are not permitted to export any soil from 1 Buggy Whip Drive. ®P..mfO C✓ RgCYCV1 •401• l r • Page 2. We will promptly consider this matter when you submit the necessary written evidence supporting your request. Should you desire to discuss this further, please do not hesitate to call. Sincerely, fti Craig R. Nealis City Manager CRN:mjs mchatt ie/export.corres cc City Council Lola Ungar, Principal Planner Bernard Howroyd Robert Jonas �•. 15.r .140--15.04.150 • 15.04.150 Section 7015.4 amended. Section 7015 of the Building Code, entitled 'Excavations,' is amended to add subsection 7015.4 to read: 7015.4 BALANCED CUT AND FILL RATIO. 1. No export or import of soil shall be permitted from or.to any lot in the City. 2. No grading plan for which a permit is required shall be approved unless the amount of soil to be cut from the site equals the amount of soil to be filled on the site. 3. The City Manager may grant an exception to the requirements of parts 1 and 2 of this paragraph (d) to allow for the import or export of soil not to exceed 500 cubic yards if he or she finds, based upon written reports and other information submitted, that all of the following conditions are present: (a) construc- tion of a structure on the lot or parcel has com- menced, (b) that the need to import or export the soil could not have been foreseen prior to commencement of construction, and (c) that either the structure cannot be completed without the requested import or export of soil or that an emergency condition exists due to the threat of land subsidence or other imminent danger. (Ord. 257-U §1(part), 1995). 173 (Rolling Hills 5/96) . SO* BAY ENGINEERING CI IPANY Il.i, i I PIO Y •� .I��.�uz:.'ns.rh. �� September 19,1996 Craig Nealis City Manager City of Rolling Hills 2 Portuguese Bend Road Rolling Hills, CA 90274 E f: 741 r" SEP 2 0 1996 Cir' OF RG 4 1-;1.1S BY Dear Mr. Nealis: I was copied a letter from AGI Geotechnical, Inc. in which they stated a need for dirt at 7 Maverick Lane. At this time I am requesting that we be allowed to export the allowable maximum of 500 cubic yards of earth from the Blazevich property. In as much as we have already moved 260 cubic yards to complete the Hilliard job, this would leave 240 cubic yards that we would be allowed to export. There has been an urgent request from the Caballeros to obtain dirt to finish the Hix ring. I am estimating 110 cubic yards would complete that task. The remainder, 130 cubic yards, be used to finish the Howroyd project as requested in the AGI letter, which is enclosed. Thank you for your consideration. Sincerely, SOUTH BAY ENGINEERING COMPANY -4. 1 ,%/l eCL Douglas K. McHattie Vice President 96\nealis2.sam\96ami:ja ❑ 304 TEJON PLACE • PAWS VERGES ESTATES. CA 90274 • (310) 375.2556 IN L.A. (213) 772.1555 • FAX (310) 378.3816 O 521 SPECTRUM CIRCLE. SUITE A • OXNARD. CA 93030 • (805) 278.0381 • FAX (805) 278.0681 • A.O.I. GEOTECHNICAL, INC. 7247 Hayvenhurat Avenue, Unit A-2 • Van Nuys, CA 91408 • (818) 785.5244 • FAX (818) 785.8251 September 4, 1996 Job # 4-1332-03 Bernie Howroyd #7 Maverick Rolling Hills, Calif. 90274 RE: Grading operations at above mentioned location Dear Mr. Howroyd; During my observations of the grading operations on the slope behind your residence, it is obvious that the soil being placed is taking a tremendous shrink. This is not an uncommon occurrence in this area and can generally be remedied with the importing of soil from another local project. Since all of the criteria for your project is predicated on the pad reaching proposed design elevation, and the high shrinkage factor is making that unlikely, you may be needing soil. As luck would have it, a recent backfill design criteria change for the basement walls at # I Buggy Whip Drive, here in rolling hills, allows you that opportunity. If this is may be of any benefit to you feel free to contact Dutch Phillips ( grading contractor ) # I Buggy Whip. The job site Phone is 310-541-9925 or the fax No. is 310-541-2969. Thank you for your time, Kevin M. ,%orSoil?Phnician Engineering Geology • Soil Engineering • Environmental Studies •City ol Roiling ilitio August 28, 1996 Mr. Anthony Iacono Palos Verdes Post Office 955 Deep Valley Drive Palos Verdes Peninsula, CA 90274 INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 E-mail: cityofrh@aol.com Dear Mr. Iacono: This is to inform you that the City of Rolling Hills will be adding the following street address: 5 Sagebrush Lane - under construction Please feel free to call me if you have any questions concerning this matter. Since Lola Ungar Principal Planner LML:mjs correspondence/PO sagebrush.lu Printed on Recycled Paper. City o/ RO//iny Jh// THOMAS F. HEINSHEIMER Mayor GODFREY PERNELL Mayor Pro Tern FRANK E. HILL Councilmember El ALLEN LAY Councilmember JODY MURDOCK Coundifinember March 27, 1995 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos.Verdes, CA 90275 Dear Mr. and Mrs. Hao: INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310)377.1521 FAX (310) 377.7288 At the regular meeting of the Rolling Hills Traffic Commission held Friday, March 24, 1995, Traffic Commissioners considered the staff report relative to the driveway access to 5 Sagebrush Lane. Following deliberation, Commissioners made the following recommendations: • That the foliage on the north side of Sagebrush Lane, as it meets Upper Blackwater Canyon Road, be trimmed for a distance of 10 feet inward from the roadway to a distance of 7 feet from the ground to accommodate sight distance. • That the volunteer tree, approximately 40 feet south of the driveway entrance as it meets Upper Blackwater Canyon Road, be removed. Since these trees are not on your property, you will need to approach your neighbors to address this situation. These recommendations will be presented to the City Council at their regular meeting to be held on Monday, April 10, 1995 beginning at 7:30 p.m. in the Rolling Hills City Council Chambers, 2 Portuguese Bend Road, Rolling Hills. Should you wish to discuss this matter prior to that meeting, please feel free to contact us at City Hall at 377-1521. Thank you for your cooperation. Sincerely, A 44 Craig R. Nealis City Manager CRN:mlk hao2.1ft cc Mr. Doug McHattie, South Bay Engineering • Ci1y ol Rollins THOMAS F. HEINSHEIMER Mayor GODFREY PERNELL Mayor Pro Tem FRANK E. HILL Councilmember B. ALLEN LAY Councilmember JODY MURDOCK Councilmember March 13, 1995 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos Verdes, CA 90275 Dear Mr. and Mrs. Hao: • INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 At the regular meeting of the Rolling Hills City Council held Monday, April 10, 1995, City Councilmembers approved the recommendation of the Traffic Commission relative to the establishment of your driveway access from Sagebrush Lane (private drive) to Upper Blackwater Canyon Road. As you are aware, Sagebrush Lane is a private non -dedicated roadway and purview of the Traffic Commission was limited to that roadway's opening onto the Community Association maintained Upper Black Water Canyon Road. A copy of the staff report that was presented to the City Council is attached for your information. As you will notice in that document, you are directed to record this correspondence outlining the findings as listed below relative to establishment of this driveway in conjunction with your project. The findings of the City Council as recommended by the Traffic Commission include: • That the foliage on the north side of Sagebrush Lane, as it meets Upper Blackwater Canyon Road, be trimmed for a distance of 10 feet inward from the roadway to a distance of 7 feet from the ground to accommodate sight distance. • That the volunteer tree, approximately 40 feet south of the driveway entrance as it meets Upper Blackwater Canyon Road, be removed. Should you wish to discuss this further, please do not hesitate to call. Thank you for your cooperation. Sincerely, 4-14% Craig R. Nealis City Manager CRN:mlk hao3.ltr cc: Mr. Doug McHattie, South Bay Engineering Peggy Minor, RHCA Manager ®Printed on Recycled Paper. • • pre -escrow disclosure residential development A. G. KEENE ASSOCIATES e; # 16 2601 E. Victoria St., # 308 Rancho Dominguez, California 90220 (310) 537-6615 (805) 821-3939 February 17, 1995 To: City of Rolling Hills #2 Portuguese Bend Road California 90274 Attn: Lola Unger environmental geohydrologiy Subject: Oversight Review of #5 Sagebrush Road; Final Report to the City. Reference: 1) Geology Review Sheet by M. Montgomery, 1-13-95, #5 Sagebrush, County of Los Angeles 2) As -graded Geologic Report by Keith Ehlert, 12-12-94, Lot 3, Tract 30345, Rolling Hills. 3) Oversight Review of #3 Sagebrush by A. Keene, 1-16-95. 4) Interim Soils Compaction Report, Lot 3, Tract 30345, by A. G. I. Geotechnical, Inc. 12-14-94. -Scope- The purpose of this report is to summarize my findings regarding the re -grading of Lot 3, Tract 30345. This lot is known variously as #3 Sagebrush Ln; #4 Sagebrush Ln; #5 Sagebrush Ln and finally, as #4 Canyon Mesa. My letter of August 3, 1994 itemized on -site grading conditions during July, 1994. As discussed in the letter, the old adobe soil was benched for support of engineered soils above the old key area on the north side of the old fill. At this time the shallower portion of the old fill appeared loose for compacted fill, with unusually deep benching. Exposed bedrock was neutral relative to stability; the northern portion exposed an anticlinal configuration which could also be described as supportive. My letter of January 16, 1995 indicated that my observations showed no landsliding existed on the nearby exposed bedrock shales. The report by K. Ehlert is compatible with my findings. The only question I had at this time was pertinent to the use of Qols (old landslide debris) underlying the old compacted fill and the mostly re -compacted fill. The • • County required 309 statement, page 6 of Ehlert's report, was accepted without a stability analysis by A. G. I. Geotechnical, their report dated 12-14-94, by Jaun A. vidal. 309 Statement The County Geologic and Soils Review Sheets (1-13 and 1-17, 1995) would appear to indicate the 309 statement made by Ehlert was acceptable despite that Qols mapped as underlying the old and now compacted fill. The Qols would normally automatically require a stability analysis showing a safety factor (S.F.)of at least.=1.5 for new construction without a waiver being recorded. None was submitted and yet the County approved the site for construction. I do not know why; I am not privy to their reasoning. It my be that the original reports by 1) Lockwood; 2) Converse Wood Davis Dixon; and Lockwood Singh and Associated met the necessary Section 309 statement required by the County, and Ehlert's inclusion of a 309 statement was unnecessary. Sewage Disnosal To date, the location of the proposed seepage pit for effluent disposal has not been specified or plotted on the As -graded Geologic Map by K. Ehlert. This may be beyond his area of reponsibility. This should be done eventually, even though the County did not feel it was necessary at this time. There could be a tacky problem here, in view of the fact that Qols is shown to underly the old and newly compacted fills. No one wants to introduce sewage effluent into old slide debris. Sewage disposal should be made into bedrock shales with subdrainage away from the fill and any old in -place slide debris. This appears to be a geologic procedural conundrum for which I have no solution. Perhaps the approved lcoation is already on record and was specified by Converse, etal or Lockwood -Singh Associates. Summary From the content of the As -graded Geologic Report by K. Ehlert and the Interim Soils Compaction Report by A. G. I., Inc., it appears the only responsibility Ehlert and A. G. I. had was to take out and replace the old fiill and determine the existence or non-existence of landslide planes in the underlying bedrock. To this end, they have complied to the satisfaction of the County. Please call if you have any questions. Sincerely,^ �c • A. G. Keene 2 • • ei //'J/ Jhi'/? THOMAS F. HEINSHEIMER Mayor GODFREY PERNELL Mayor Pro Tern FRANK E. HILL Councilmember B. ALLEN LAY Councilmember JODY MURDOCK Councilmember February 7,1995 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos Verdes, CA 90275 Dear Mr. and Mrs. Hao: INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 At an adjourned regular meeting of the Rolling Hills Traffic Commission held Wednesday, January 25, 1995, Commissioners considered your request for a driveway access at 5 Sagebrush Lane. During discussion, some confusion arose as to whether Sagebrush Lane had been accepted for maintenance by the Rolling Hills Community Association or whether it is a private driveway access to the properties that are adjacent to this roadway. In order to determine if the Traffic Commission has purview over this roadway, consideration was continued to the next regularly scheduled meeting of the Traffic Commission to be held on March 17, 1994. We will keep you informed of our findings. Thank you for your cooperation in this matter. Should you have any questions or need more information, please do not hesitate to call. Sincerely, Craig R. Nealis City Manager CRN:mlk hao2.1 tr cc: City Council Traffic Commission Peggy Minor, RHCA Manager Mr. Doug McHattie, South Bay Engineering • • pre -escrow disclosure residentiol development A. G. KEENE ASSOCIATES enybrueniny bald, 16 2601 E. Victoria St., # 308 Rancho Dominguez, California 90220 (310) 537-6615 (805)821-3939 January 16, 1995 To: City of Rolling Hills # 2 Portuguese Bend Road California 90274 Attn: Lola Unger Subject: Oversight Review of # 3 Sagebrush Road. Reference: As -Graded Geological Report Proposed Residential Construction Lot 3, Tract 30345, Rolling Hills, CA By environmental geohydrologiy L• JAN " 1995 City 0` P..:1`l:rg Hills The observations made by Keith Ehlert in the above report reference, whiich is dated December 12, 1994 are compatible with my own observations of the site grading e.g., that 1) there is no apparent landslide feature in the bedrock supporting the new fill or for that matter the old fill and 2) the old fill appears to be very firm indeed with no indication of subsequent failure since it was placed. From the text of the report, it would appear that no one has found evidence of old (Quaternary) landslide, annotated on the sections and maps as Qols, including Bruce Lockwood who was the initial investigating geologist. I find that the use of Qols is incompatible with findings of all observers, including myself. The apparent departures of bedding from consistency of a northward dip can be easily explained by minor tectonic folding; in fact, the north end of the excavation for the new fill revealed a small anticlinal / synclinal relationship with no slip planes to that depth. Lockwood states he observed none at deeper depths in 1989. Stability Relationships and Conformance With Code 309 If indeed the consultants feel that, despite their observations to the contrary, that the site is underlain by old landslide debris, I find it difficult to accept their 309 statement without a stability analysis based on at least a hypothetical slide plane beneath the older fill, which, as yet, has not been explored. Their option is to eliminate the use of the term Qols and • • stand by their observations and convictions, or, submit a stability analysis showing a safety factor of 1.5 or greater. Alternatively, the County may accept the report provided they are convinced the old slide debris shown on the map and geologic cross section has a calculated safety factor of at least 1.25. This would require a recorded slide waiver. County Review I suggest the City waits for the County review on this matter before discussing the question of a reqired stability analysis with them. If you have any further questions, please call. A. G. Keene 2 THOMAS F. HEINSHEIMER Mayor GODFREY PERNELL Mayor Pro Tem FRANK E. HILL Councilmember B. ALLEN LAY Councilmember JODY MURDOCK Councilmember 1 Ci1 0/Ie0/A Jl<fP, S J • . je...,brle.:7/2 January 5, 1995 Mr. and Mrs. James Hao 30041 Highridge Road Rancho Palos Verdes, CA 90275 Dear Mr. and Mrs. Hao: NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS. CALIF. 90274 (310) 377.1521 FAX: (310) 377.7288 As you are no doubt aware, your land use application in Zoning Case No. 522 was approved by the Planning Commission at their regular meeting held on December 20, 1994. Since your Zoning Case involves creation of a new driveway, it requires review by the Rolling Hills Traffic Commission. The Planning Commission decision will be reported to the City Council at their regular meeting to be held on January 23, 1995. I have spoken to your representative, Mr. Doug McHattie of South Bay Engineering, who will be preparing plans for review by the Traffic Commission on Friday, January, 20, 1995, beginning at 8:30 a.m. in the Rolling Hills City Council Chambers, 2 Portuguese Bend Road, Rolling Hills, California. There is a $300.00 fee for this review. Payment can be provided by your representative. Actions of the Traffic Commission will be reported to the City Council on January 23, 1995. Should you wish to discuss this further, please do not hesitate to call. Thank you for your cooperation. Sincerely, • 46 4. Craig R. Nealis City Manager CRN:mlk hao.ltr cc: Doug McHattie, South Bay Engineering Pr nteri on Rr,r:Yclr•d F"rnna., • Ci4f ol THOMAS F. HEINSHEIMER Mayor GODFREY PERNELL Mayor Pro Tern FRANK E. HILL Councilmember B. ALLEN LAY Councilmember JODY MURDOCK Councilmember June 29, 1994 Mr. Doug McHattie South Bay Engineering 304 Tejon Place Palos Verdes Estates, CA 90274 Dear Mr. McHattie: INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 At the regular City Council Meeting held Monday, June 27, 1994, members of the City Councils approved of the Planning Commission Resolution 94=14 entitled: A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROLLING HILLS GRANTING SITE PLAN REVIEW APPROVAL TO PERMIT SOIL EXPLORATION AND INVESTIGATION TO DETERMINE UNDERLYING STRATA AND TO REPAIR PREVIOUSLY ABORTED GRADING IN ZONING CASE NO. 514. During City Council deliberation, and as a condition of approval, the City Council requested that the City hire an outside geologist to review and oversee the certified geologist employed by Del Amo Savings Bank during all hours of exploration and investigation. The purpose of this is to ensure, from the City's perspective, that removal and refill at the site is accomplished in a manner that would pose no hazards on site or to adjoining properties. It was further stipulated that Del Amo Savings Bank would be responsible for paying the costs associated with this City employed geologist. You attended the City Council meeting and agreed with this requirement. When we have a firm cost for this additional review, we will communicate that information to you immediately. ®Printed on Recycled Paper Page 2 Should you wish to discuss this further, please do not hesitate to call. We thank you for your cooperation. Sincerely, (ii/Ck Craig R. Nealis City Manager CRN:mlk corres.cm\delamo.ltr cc: City Council Principal Planner Lola Ungar Lata Thakar, Los Angeles County, Building and Safety Del Amo Savings Bank C'4 o/ Ro/An �re� THOMAS F. HEINSH EIMER Mayor GODFREY PERNELL Mayor Pro Tern FRANK E. HILL Councilmember B. ALLEN LAY Councilmember JODY MURDOCK Councilmember June 2, 1994 Mr. Douglas McHattie, Vice -President South Bay Engineering Company 304 Tejon Place Palos Verdes Estates, CA 90274 Dear Mr. McHattie: INCORPORATED ANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CALIF. 90274 (310) 377-1521 FAX: (310) 377-7288 Thank you for your letter of June 1, 1994 requesting a special meeting of the Planning Commission to review the resolution of approval for the exploration and remedial repair at Sagebrush Lane (Lot 100-3-RH). We presented your request to Planning Commission Chairman Allan Roberts who responded that there was no emergency and that such a request would be setting an unnecessary precedent that would not be judicious. Thank you for your cooperation. Please feel free to call me at (310) 377-1521 if you have any further questions. Sincerely, teet 7� LOLA M. UNGAR PRINCIPAL PLANNER cc: Members of the Planning Commission Mr. Craig Nealis, City Manager Ms. Dianne Bowers, Del Amo Savings Bank ®Panted on Recycled Paper