Loading...
none, Addition to SFR, CorrespondenceP6UNTY OF LOS ANGAES GAIL FARBER, Director July 1,2010 Okuma 2 Buckboard Lane Rolling Hills, CA 90274 Calfas 9 Georgeff Road Rolling Hills, CA 90274 DEPARTMENT OF PUBLIC WORKS "To Enrich Lives Through Effective and Caring Service" 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 http://dpw.Iacounty, gov 2 BUCKBOARD LANE, 9 GEORGEFF ROAD, ROLLING HILLS EXISTING DRAINAGE CONDITION ADDRESS ALL CORRESPONDENCE TO: P.O. BOX 1460 ALHAMBRA, CALIFORNIA 91802-1460 IN REPLY PLEASE REFER TO FILE: B-0 With the particularly wet winter this past year, the City was notified of drainage concerns and problems arising from 2 Buckboard Lane (Okuma) and 9 Georgeff Road (Calfas). In response, on May 27, 2010, a meeting was held at City Hall between Rolling Hills staff and Mr. Okuma to discuss the existing drainage condition between the subject properties. On June 7, 2010, a similar meeting was held at the Building and Safety office in Lomita with Mr. Calfas. As a result of these meetings and subsequent evaluation of the situation, we have determined that actions are necessary on both properties to minimize the potential for future erosion or mudflow. To improve drainage, based on existing field conditions, the following is requested: 2 Buckboard Lane An existing swale currently conveys drainage down the rear slope of the property. Recent rains have shown that property drainage from the rear yard is not properly conveyed to the inlet of the swale at the top of the slope. There is also no means of energy dissipation to reduce the velocity of runoff at the outlet of the swale, as shown on plans on file with the City. Plans will need to be prepared and, upon their approval by the Building and Safety office, implemented to convey runoff from the property into the existing swale and to reduce runoff velocity at the outlet. 9 Georgeff Road When recent improvement plans for 9 Georgeff Road were submitted to the City, the swale described above at 2 Buckboard Lane was not clearly visible in the field. As demonstrated during recent rainfall, the existing drainage improvements at 9 Georgeff Road do not effectively convey runoff from the existing swale. Also, the hydrology study i • July 1,2010 Page 2 submitted for the design of drainage improvements at 9 Georgeff Road did not reflect the full area contributing runoff to these improvements. Plans will need to be prepared and, upon their approval by the Building and Safety office, implemented to receive the runoff conveyed in the existing swale. As you know, between your properties is an existing easement for equestrian and other purposes, which we recognize has been restored for the benefit of the community. In that the easement falls under the jurisdiction of the Rolling Hills Community Association, not the City, please be mindful that you may need their review and approval of any modifications to the easement. To complete this process before fall and winter rains, we request that you submit engineered plans in response to this letter to City Hall by September 1, 2010. We appreciate your continued cooperation and mutual efforts to resolve the existing situation. If you have any questions, please feel free to call me at (310) 534-3760. Very truly yours, O 14,,,m i, i41 D Kit Bagnell District Engineer, Los Angeles County Building and Safety Building Official, City of Rolling Hills P:\bspub\ADMIN\Kit\Lomita\BUCKBOARD LANE, GEORGEFF RD.docx cc: City of Rolling Hills Planning Director Rolling Hills Community Association • • re, Rota/Iowa& December.30, 2009 Mr. Sean Bond Integ Roof Co. 6331 Cherry Ave. Long Beach, CA 90808 Re: Construction and Demolition Waste Permit # 28 Dear Mr. Bond: Pgvlcvo//L L INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CA 90274 (310) 377-1521 FAX (310) 377-7288 was PA ggQ i pia t DvlOg ILL 0 5a 30 4,000/ 0,/'14 lea v6 t/l II Thank you for obtaining a City of Rolling Hills Construction and Demolition Waste Permit for 2 Buckboard Lane. With issuance of the permit and your commitment and cooperation, we look forward to accomplishing the recycling and diversion goals that the permit is intended to achieve. As noted in the permit application, please be mindful that within thirty (30) calendar days following the completion of each construction project for which your permit is issued, you are required to submit documentation to the City of Rolling Hills demonstrating that at least 50% of the construction and demolition waste generated from the project is not disposed at a landfill. Satisfactory documentation of compliance is necessary for final inspection of the construction project and, if applicable, the issuance of.a certificate of occupancy. In other words, your failure to comply with the recycling/diversion requirement will cause the City to withhold from your clients final approval of the construction project you are servicing. Enclosed you will find a "Recycling and Waste Reduction Compliance Report" for you to document the disposal of your construction and demolition waste. The form must be supported and accompanied by originals or photocopies of receipts, weight tickets, invoices or other records of measurement from recycling companies, the landfill and/or disposal companies. It is strongly recommended that you submit this form as frequently as you dispose of construction and demolition waste rather than wait until the end of a project. This will avoid complications with final inspection of the project and with you and your client. Additional forms can be obtained at City Hall or on the City's website at www.Rolling-Hills.org. Please be aware that your permit will expire on 10/26/2010 at which time a new permit will be required. If the conditions of the permit are not followed, the permit will not be renewed or could be revoked mid- year. Recycling is important not just for extending the usefulness of landfills; it is valuable for sustaining the environment. Again, thank you. If you have any questions, please do not hesitate to call City Hall at 310.377.1521. Sincerely, ckteglaba Heidi Luce Deputy City Clerk HL 12-30-09 C&D Permit Confirmation-ltr.doc c: Yolanta Schwartz, Planning Director, City of Rolling Hills • BLAIR ASSOCIATES, Inc. architecture and project management services Ms. Youlanta Schwartz Planning Director City of Rolling Hills No. 2 Portuguese Bend Road Rolling Hills, Ca 90274 Subject: Change of address 7 Georgeff Rd. Dear Youlanta, Per our previous conversation we hereby are requesting that the address of 7 Georgeff Road be changed to 2 Buckboard Lane. We have verified with the Rolling Hills Homes Association that this address is available for this comer lot. We shall design and construct a new front walkway and relocate the mail box to Buckboard Lane when approved. Please notify us as soon as this address change has been approved. If you have any questions please do not hesitate in calling us. Kind Regards, &ki Tom Br, RAIA Architect Concurrence: .1410)p- Pium 44 ovt.,z CITY OF ROLLING HILLS Approved •I�L" PLANNII4G DEPARTMEAT DatP o Mr. or Mrs. Mark T. Okuma cc: Rolling Hills Homes Assoc. Owners Mailing Address: 2785 Pacific Coast Highway, Box E149, Torrance, California 90505 Phone: 310.320.2016 Fax: 310-320.0237 www.blairassociates.net