none, Mitigate drainage problem, ApplicationgXPORT/fMPORT OF SOIL FOR EROSION CONTROL
A PROFESSIONALLY PREPARED DRAINAGE PLAN FOR PERMANENT REPAIR SHALL BE REQUIRED IF THE
EROSION IS RE -OCCURRING AND IF/WHEN THE AMOUNT OF DIRT REQUESTED, WHEN ADDED TO THE DIRT
USED IN PREVIOUS YEARS, EXCEEDS A TOTAL OF 500 CU.YDS. (RHMC Sections15.04.130 and 15.04.150)
PropertyOwner(s) /1bGGl/UCn fi L(S (2tflrflOAJTY 11 'ene177vij
Address(es)._11,12 TC.07-
Phone No(s). rTO- S-1 I -
Reason(s) to export/import soil. Has the area eroded previously? Has it been previously corrected with import/export of
dirt?
I MS T-194 c_ lPii2T ' ti.JD >gSPt-f &T ("a1A D 78er2pyt
T men- H/1.5 ?cJi' D rgGJAV TIME. 4P-)t 770/U _
‘---D2?' 15 A)E T ro rl .) - UEt1(c(—E r6
c571ProV OFF
To your best recollection how many times has the area eroded? When? ��j.(,-T-AoT c 1? 145:44,T/(`),<J
4:67-,FT) t)() 7?) ThiVcJel-Y Gt r 17 !2()/U �F
How much dirt was Imported in the past (total of all events) 1 /A ISUY?t''
PICTURES OF THE ERODED AREA(S): Submitted:
ADDRESS 0 Of ST/U()Tr (79/U6- c57 t'U S 1 reorn lc�fNr'.7
Where soil is proposed to be moved FROM
ADDRESS &957F7.Fi.,> r-Pprza)Creirs4-7 c5cur /
Where soil is to be moved TO
__ c .6i,e
4-6
AMOUNT of soil to be moved (cu.yds.): 7L(O � AREA (square feet) to be corrected
WORKING AT THE JOB SITE The City Building Inspector/staff must verify that the area has eroded and the amount of
soil to be moved, followed by an inspection of the repaired area. You must notify City staff should there be deviations or
corrections in the field to modify the approved project. The Rolling Hills Municipal Code requires that ail graded areas be
balanced on site and prohibits the export or Import of soil to or from any lot In the City or to and from outside the City
unless aooroved by the Citv Manager/deek2nep under certain conditions.
SOIL FOR EROSION CONTROL
2011
1 understand yd agree to abide by these requirements.
Date ( .
APPROVED:
DATE
1
Owner/Applicant
HI c. c.S Co
Date Contractor/Applicant's Agent / License No.
11/5 SO G. Phone:
CJ cT C rCLUNG ELILL:
r:ro\'ed
PL./.I:Nr. fiZP RTME
CITY MANAGER OR DESIGNEE
CONDITIONS:
)6CAA,E47t,tail OACIltit4 4 6 L
_PA ?-1-tair CLeLA—
•
SOIL FOR EROSION CONTROL
2011
EXPORT/1MPORT OF SOIL FOR EROSION CONTROL
A PROFESSIONALLY PREPARED DRAINAGE PLAN FOR PERMANENT REPAIR SHALL BE REQUIRED IF THE
EROSION IS RE -OCCURRING AND IF/WHEN THE AMOUNT OF DIRT REQUESTED, WHEN ADDED TO THE DIRT
USED IN PREVIOUS YEARS, EXCEEDS A TOTAL OF 500 CU.YDS. (RHMC Sections15.04.130 and 15.04.150)
Property Owners) /AZ7 1 ll LLS Cornrn�oji 7Y 79(_5.5 179-T"jO,(�
Address(es) l IR/27-06-ff fl E < i(.)(� �p rj
Phone No(s). 010 - (51-/ - a366f
Reasons) to export/import soil. Has the area eroded previously? Has it been previously corrected with import/export of
dirt?
fln /ko/UGI d12-rOGrcYSE -30/0D fll�
10 (/9,UDLI DE 7912-ER /vuoi' ADl TJ®/V &L . 171 PT To
,2 T Gz/?Oc. )r) U TI c 1 T Ll E 5
To your best recollection how many times has the area eroded? When? DOE TO �-/9/ )I %%011Ei'fo r
1) "fib 6ael9 CooST,9iOr "RCmer7/ 770A) EFFOZTS t9rte
I'YIA1A)TA1k) Roigp ,5floc.,+-,Da✓R F-02 6130ue G1IzvciA) I� 077a TIE s
How much dirt was imported in the past (total of all events) UY)4S02e
PICTURES OF THE ERODED AREA(S): Submitted:_,U/h ._.
ADDRESS J"Oi�Y ItR{�I� �I - -F►20YY) MEET XCAI/61TIO/0 •CND,
Where soil is proposed
prroposed to be moved FROM Neck-) J'V E 6-1 2VA.) b CovJo T
ADDRESS t'0r?j1)G7Oe65A)D IO79i7 So r-1 - i-wD 8%1OC)L }1_
Where soil is to be moved TO
AMOUNT of soil to be moved �u d �� Q T AREA
S
( y ) A(square feet) to be corrected
WORKING AT THE JOB SITE The City Building Inspector/staff must verify that the area has eroded and the amount of
soil to be moved, followed by an inspection of the repaired area. You must notify City staff should there be deviations or
corrections in the field to modify the approved project. The Rolling Hills Municipal Code requires that all graded areas be
balanced on site and prohibits the export or import of soil to or from any lot in the City or to and from outside the City
unless apnroved by the City Manaaer/desionee under certain condition.
SOIL FOR EROSION CONTROL
2011
4
1 understand and agree to abide by these requirements.
l
Owner/A
APPROVED:
P-0 I
DATE /
CONDITIONS:
Ferz- 12 0 et.
SOIL I:OR EROSION CONTROL
2011
Date Contractor/Applicant's Agent / License No.
Phone:
i�cs Cc'v101. 71ssoc.
/45h%CITY MANAGESIGNEE
•
By
EXPORT/IMPORT OF SOIL
UP TO 500 C.Y. OF DIRT MAY BE IMPORTED OR EXPORTED FROM A CONSTRUCTION SITE DUE TO SITE
CONDITIONS OR DUE TO UNFORSEEN CIRCUMSTANCES AND ONLY WITH CITY APPROVAL. (RHMC Sections
15.04.130 and 15.04.150)
Property Owner(s) X // C/
Address(es) / "61TT lJ (; U f= C / /3O /2' L/.h'6 1/ /I L <
Phone No(s). 2/6 - S -t 1- 3 c 4 9-
t1A1; 2 8 2012
City of Rolling Hills
Reason(s) for export/import soil. Has construction commenced?
C i ` Piet Ji/ /I/NO f off1 FG fi .5 (4 T/Z: T%
/1)6'GyIvHIP Q/v 626fT
ADDRESS Poppy f'ZA j`n d � I, Cr-
Where soil is proposed to be moved FROM
ADDRESS C/ r$
Where soil is to be moved TO
AMOUNT of soil to be moved (cu.yds.): 5
i
DEPTH of cut/fill at site (feet) l
AREA of cut/fill at site (square feet)
WORKING AT THE JOB SITE: The City Building Inspector/staff must verify the amount of soil to be moved, and after it
has been deposited, the amount of dirt deposited. You must notify City staff should there be deviations or corrections in
the field to modify the approved exportation or importation. The Rolling Hills Municipal Code requires that all grading be
balanced on site and prohibits the export or import of soil to or from any lot in the City or to and from outside the City
unless approved by the Citv Manaaer/desianee under certain conditions.
I understand and agree to abide by these requirements.
3- ,9,f- att-- Ad6L-
Date Owner/Applicant Date Contractor/Applicant's Agent / License No.
Date
Engineering Geologist/License No. Date
Phone No.
Grading Contractor/License No.
EXPORT/IMPORT OF SOIL DURING CONSTRUCTION
2011
APPROVED:
q / PI/ 2. ' kg
DATE 1 I/ CITY MANAGER OR ESIGNEE
CONDITIONS:
EXPORT/IMPORT OF SOIL DURING CONSTRUCTION
2011
• •
INSTRUCTIONS FOR REQUEST TO EXPORT/IMPORT OF DIRT AFTER
CONSTRUCTION COMMENCES
(RHMC SECTIONS 15.04.130 and 15.04.1501
• Submit the attached form
• Submit additional sheets if necessary to detail the project
• Submit revised site plan/grading plan/cross sections and any other information
necessary to clearly depict the resulting changes on both properties
• Staff and/or Building Inspector must verify the amount of dirt requested to be
moved
• Staff may determine that the request constitutes a major modification to the project
and therefore Planning Commission review may be necessary
• Staff may determine that the request exceeds staff's authority to approve the request
over-the-counter and therefore Planning Commission review may be necessary
(Planning Commission review is necessary when a cut or fill exceed 3 feet high or
when the activity covers more than 2,000 sq.ft. of surface area)
• Building and Safety Dept. review and permit may be required
EXPORT/IMPORT OF SOIL DURING CONSTRUCTION
2011