Loading...
1064 RESOLUTION NO. 1064 � A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROLLING HILLS ESTABL.ISHING FEES FOR PERNIITTING AND INSPECTION AND FOR THE INCLUSION OF SOLAR AND PHOTOVOLTAIC SYSTEMS AND APPURTENANT EQUIPMENT AND REPLACING CITY COUNCIL RESOLUTION N0. 1060. THE CITY COUNCIL OF THE CITY OF ROLLING HILLS DOES HEREBY RESOLVE AS FOLLOWS: Section 1: The following fees are established and charged for applications for processing discretionary cases for Planning, Zoning and Subdivisions and shall be paid by the applicant prior to submission for public hearing, pursuant to Title 16 (Subdivision) and Title 17 (Zoning) of the Rolling Hills Municipal Code: A. Site Plan Review $ 1,500 B. Conditional Use Permit $ 1,500 C. Variance $ 1,250 D. Variance, Minor $ 750 1. Minor deviation,into required yard setback, not exceeding 5' and attached to main residential structuxe E. Multiple discretionary reviews; Most expensive fee for the first review and 1/2 fee for second � review. No cost for third or more reviews. F. Lighting Ordinance M.odification $ 750 G. Outdoor Lighting Audit $ 150 (initiated by resident) H. Time extension $ 200 I. Zone Change $ 2,000 J. General Plan Amendment $ 2,000 K. . Zoning/Subdivision Code Amendment $2,000 L Discretionary Approval Modification $ 2/3 of original application fee M. Appeal Fee $2/3 of original application fee N. Planning Commission interpretation $375. Fee to be credited if and miscellaneous Planning results in filing of a formal Commission reviews application to Planning Commission O. Environmental Review for $200 Determination of discretionary permits P. Negative Declaration As adjusted annually by the CA Dept. of Fish and Game, plus 20% Q. Mitigated Negative Declaration As adjusted annually by the CA Dept. of Fish and Game, plus 20% R. Environmental Impact Reports Consultant fee, plus 20% New and amended provisions are in bold Resolution No 1064 1 S. County Clerk Processing Fee $ 100 T. Lot Line Adjustment $ 1,500; plus County fee U. Tentative Parcel/Tract Map $ $1,500, plus County fees plus 20% V. Final Parcel/Tract Map County fee plus 20% W. Zoning violation and construction $ 1,000 penalty fee 1. Applications for illegal or "as built" grading or construction or non-compliance with approved plans that require Planning Commission review. Fee is charged in addition to the discretionary application review fee. X. Stop work order $200 1. Fee charged for each additional "stop work order" that is issued beyond the original stop work order for illegal construction and grading activity requiring Planning Commission review and approval. Y. Service Request County fee plus 20% (For services provided by L.A. County not included in the General Services Agreement) Section 2. The following fees are established and charged for applications for processing View Impairment and Traffic Commission cases: A. View Impairment $ 500 B. Traffic Commission Review 1. New driveways or other traffic $ 300 related items Section 3. The following fees are established and charged for General Administration processing: A. General Plan $ 30 B. Zoning Code $ 25 C. Subdivision Code $25 D. Meeting Tapes (Audio) $ 25 E. Budget $30 F. Zoning Map $ 3 G. Xeroxed copies, each page $ 0.25 H. False Alarms 1St $50 2nd $ 100 3rd $ 150 4� $200 5� $ 250 Section 4. The following fees are established and shall be collected for each permit pursuant to Title 15, (Building and Construction) of the Rolling Hills Municipal Code: New and amended provisions are in bold Resolurion No 1064 2 A. 1. BUILDING PERMIT Two and one-half times the amount set forth in the Building Code for each fee, table and schedule therein. 2. PARKS AND RECREATION Each new residential dwelling shall pay 2% of the first$100,000 of construction valuation, plus 0.5% of such valuation over$ 100,000. B. PLUMBING PERMIT Two and one-half times the amount set forth in the Plumbing Code for each fee, table and schedule therein. C. MECHANICAL PERMIT Two and one-half times the amount set forth in the Mechanical Code for each fee, table and schedule therein. D. ELECTRICAL PERMIT Two and one-half times the amount set forth in the Electrical Code for each fee, table and schedule therein. E. GEOTECHNICAL REPORT, 0.42% of the valuation of the proposed SITE AND PLAN REVIEW structures; however, minimum fee shall be $535.00 and the maximum fee shall be $3,588.00 F. SOLAR AND PHOTOVOLTAIC The amount set forth in the Los SYSTEMS AND APPURTENANT Angeles County Building and EQUIPMENT Electrical Codes for each fee,table and schedule therein,plus$60.11 City administrative fee. Section 5. The following fees are established and shall be collected for each permit pursuant to Title 15, (Building and Construction) of the Rolling Hills Municipal Code for review conducted by the City's contract building official, other than Los Angeles County Department of Building and Safety: A. BUILDING PERMIT In addition to the provisions of Section 4 A.1 of this resolution, a 25% surcharge on Los Angeles County Department of Building and Safety fees shall be charged for the alternative use of the City's contract building official. B. PLUMBING PERMIT In addition to the provisions of Section 4 B. of this resolution, a 25% surcharge on Los Angeles County Department of Building and Safety fees shall be charged for the alternative use of the City's contract building official. C. MECHANICAL PERMIT In addition to the provisions of Section 4 C of this resolution, a 25% surcharge on Los Angeles County Department of Building and Safety fees shall be charged for the alternative use of the City's contract building official. New and amended provisions are in bold Resolution No 1064 3 D. ELECTRICAL PERMIT In addition to the provisions of Section 4 D of this resolution, a 25% surcharge on Los Angeles County Department of Building and Safety fees shall be charged for the alternative use of the City's contract building official. E. GEOTECHNICAL REPORT, SITE AND PLAN REVIEW In addition to the provisions of Section 4 E of this resolution, a 25% surcharge on Los Angeles County Department of Building and Safety fess shall be charged for the alternative use of the City's contract building official. F. SOLAR AND PHOTOVOLTAIC In addition to the provision of SecHon SYSTEIVIS AND APPURTENANT 4F of this resolution, a 25% surcharge EQUIPMENT on Los Angles County Department of Building and Safety fees, plus $60.11 City administrative fee, shall be charged for the alternative use of the City's contract building official. Section 6. The following fees are established and shall be collected for each permit relating to construction and demolition waste: A. CONSTRUCTION AND $25 single project permit DEMOLITION $ 250 annual permit Section 7. The new fees set forth in Sections 1, 2, 3, 4, 5, and 6 above do not exceed the estimated reasonable cost of providing such services. Section 8. The City Council Resolution No. 1060 is hereby repealed. PASSED, APPROVED, AND ADOPTED this 13th day of July 2009. \ HO S HEINSHEIMER, MAYOR ATTEST: • � Heidi Luce Deputy City Clerk New and amended provisions are in bold Resolution No 1064 4 STATE OF CALIFORNIA � ) COUNTY OF LOS ANGELES ) �� CITY OF ROLLING HILLS ) , I certify that the foregoing Resolution No. 1064 entitled: A RESOLUTION OF THE CTTY COUNCIL OF THE CITY OF ROLLING HILLS ESTABLISHING FEES FOR PERNIITTING AND INSPECTION AND FOR THE INCLUSION OF SOLAR AND PHOTOVOLTAIC SYSTEMS AND APPURTENANT EQUIPMENT AND REPLACING CITY COUNCIL RESOLUTION N0. 1060. was approved and adopted at a regular meeting of the City Council on July 13, 2009 by the following roll call vote: AYES: Councilmembers Black, Hill, Lay, Mayor Pro Tem Pernell and Mayor Heinsheimer. NOES: None. ABSENT: None. . ABSTAIN: None. and in compliance with the laws of California was posted at the foll'owing: Administrative Offices. ' • ��� DEPUTY CITY CLERK New and amended provisions are in bold Resolution No 1064 5