Loading...
2019-18 RESOLUTION NO. 2019-18 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROLLING HILLS GRANTING APPROVAL FOR A SITE PLAN REVIEW FOR THE CONSTRUCTION OF A 1,789 SQUARE FOOT HOUSE ADDITION AND 324 SQUARE FOOT GARAGE ADDITION, AND TO ATTACH AN EXISTING 978 SQUARE FOOT GUEST HOUSE TO THE RESIDENCE FOR A TOTAL OF 7,519 SQUARE FOOT RESIDENCE AND 1,030 SQUARE FOOT GARAGE AND GRADING OF 50 CUBIC YARDS OF DIRT; AND A CONDITIONAL USE PERMIT TO CONSTRUCT A 799 SQUARE FOOT GUEST HOUSE IN ZONING CASE NO, 960 AT 13 EASTFIELD DRIVE (BIRKETT). THE PLANNING COMMISSION DOES HEREBY FIND, RESOLVE, AND ORDER AS FOLLOWS: Section 1. An application was duly filed by Mr. Steven Birkett (Applicant) for Site Plan Review to construct a 1,789 square foot house addition, 324 square foot garage addition, and to attach an existing 978 square foot guest house to the residence for a total of 7,519 square foot residence and 1,030 square foot garage and grading of 50 cubic yards of dirt; and a Conditional Use permit (CUP) to construct a 799 square foot guest house. The project includes associated major remodel and demolition of portions of the existing residence on an existing building pad. Section 2. The Planning Commission conducted duly noticed public hearings to consider the application at their regular meetings on October 15, 2019, and November 19, 2019 and at a field trip on November 19, 2019. The Planning Commission at the November 19,2019 regular meeting directed staff to prepare a Resolution approving the project. Neighbors within a 1,000-foot radius were notified of the public hearings and notices were published in the Peninsula News on October 3, 2019. The Applicant and his agent were notified of the public hearings in writing by first class mail and the Applicant and his agent were in attendance at the hearings.Evidence was heard and presented from all persons interested in affecting said proposal and from members of the City staff. The Planning Commission reviewed, analyzed, and studied said proposal. Section 3. The property is zoned RAS-1, and the lot is 3.21 acres in size. For development purposes, the net lot area is 2.89 acres (125,971 sq. ft.). The lot is long and narrow,having a narrow frontage along Eastfield Drive. In addition to the residence and swimming pool,the lot is developed with previously approved stable,corral,tennis court and detached garage located in the front yard area, and a guest house in the rear. Section 4. The Planning Commission finds that the development project is exempt from the California Environmental Quality Act, (CEQA) pursuant to Section 15303(new construction of single family residence and accessory structures) of the CEQA guidelines. Section 5. Site Plan Review is required to construct a 1,789 square foot house addition, 324 square foot garage addition, and to attach an existing 978 square foot guest house to the residence for a total of 7,519 square foot residence and 1,030 square foot garage and grading of 50 cubic yards of dirt pursuant to Rolling Hills Municipal Code (RHMC) Section 17.46.020. With respect to the Site Plan Review, the Planning Commission makes the following findings of fact: A. The project complies with and is consistent with the goals and policies of the General Plan and all requirements of the Zoning Ordinance. The proposed project complies with the General Plan requirement of low profile, low-density residential development with sufficient open space between surrounding structures and maintains sufficient setbacks to provide buffers between residential uses. B. The project substantially preserves the existing terrain of the lot by minimizing grading to 50 cubic yards and building primarily on existing building pad. C. The project is harmonious in scale and mass with the site,the natural terrain and surrounding residences. The proposed development, as conditioned, is consistent with the scale of the neighborhood. The proposed project is screened from the road so as to reduce the visual impact of the development. The development will be set back from the road so that views from the road will not be blocked. Significant portions of the lot will be left undeveloped. D. Grading has been designed to follow natural contours of the site and to minimize the amount of grading required to build the proposed guest house. The resulting slope will be a 2:1 gradient adjacent to the proposed addition. There is no grading in the canyon and all drainage courses remain the same. E. The project will not affect any drainage course as the drainage will mimic the existing drainage course. F. The project preserves surrounding native vegetation and mature trees. A large portion of the lot will remain undisturbed and the existing vegetation will remain. G. The project is sensitive and not detrimental to the convenient and safe movement of pedestrians and vehicles. An enlargement to the fire turnaround area is required to meet the Fire Department's access requirements. H. The project conforms to the requirements of the California Environmental Quality Act. The development project is exempt from CEQA pursuant to Section 15303 (new construction of single family residence and accessory structures) of the CEQA guidelines. Section 6. Conditionally permitted uses are not outright permitted by the RHMC. The Planning Commission must consider applications for a Conditional Use Permit and may, with such conditions as are deemed necessary, approve a conditional use which will not jeopardize, adversely affect, endanger or to otherwise constitute a menace to the public health, safety, or general welfare or be materially detrimental to the property of other persons located in the vicinity of such use. A Conditional Use Permit is required for construction of a 799 square foot guest house pursuant to RHMC Section 17.16.040. Section 17.16.210 (A)(5) of the RHMC contains conditions for a guest house subject to approval of a conditional use permit. With respect to this request for a Conditional Use Permit, the Planning Commission finds as follows: A. The proposed conditional use is consistent with the General Plan. The guest house is consistent with the General Plan because it is consistent with similar uses in the community, meets all the applicable code development standards for such use, and is located in an area on the property that is adequately sized to accommodate such use. The guest house is appropriately located in that it will be sufficiently be separated from nearby structures. The guest house is a common amenity in the City. The guest house complies with the General Plan requirement of low profile, low-density residential development with sufficient open space between surrounding structures and maintains sufficient setbacks to provide buffers between residential uses. B. The nature, condition, and development of adjacent uses, buildings, and structures have been considered, and the use will not adversely affect or be materially detrimental to these adjacent uses,buildings, or structures. The guest house is located of sufficient distance from nearby residences so as to not impact the view or privacy of surrounding neighbors.The height of the guest house will not be obtrusive or block views and is located sufficient distance from the road so as to not be visible from adjacent residences. As part of the approval, a condition is imposed that the guest house will not be rented. 2 Resolution No.2019-18 — oct e.g.• C. The site for the proposed conditional use is of adequate size and shape to accommodate the use and building proposed. The lot is 2.89 acres net in size and is sufficiently large to accommodate the proposed use. The guest house blends in with the house and will not give the property an over-built look. Sufficient areas of the lot will remain open and unobstructed and sufficient distance has been put between the house and the guest house to leave open spaces in between. D. The proposed conditional use complies with all applicable development standards of the zone district (RAS-1). The guest house complies with all conditions for guest houses pursuant to Section 17.16.210(A)(5) of RHMC.No walls or any variances are requested for the guest house use. The height of the guest house will not be obtrusive or block views. It is located a sufficient distance from the road so as to not be visible from adjacent residences. E. The proposed conditional use is consistent with the portions of the Los Angeles County Hazardous Waste Management Plan relating to siting criteria for hazardous waste facilities because the project site is not listed on the current State of California Hazardous Waste and Substances Sites List. F. The proposed conditional use observes the spirit and intent of this title. A guest house is a common amenity in the City.The construction meets all the development standards including the allowable size of 799 square feet. The proposed guest house is located a sufficient distance from nearby residences so as to not impact the view or privacy of surrounding neighbors. Section 7. Based upon the foregoing findings, the Planning Commission hereby approves Zoning Case No. 960 a request for a Site Plan Review for the construction of a 1,789 square foot house addition,attach an existing 978 square foot guest house to the residence for a total of 7,519 square foot residence and 1,030 square foot garage and grading of 50 cubic yards of dirt; and a Conditional Use Permit to construct 799 square foot guest house subject to the following conditions: A. The Site Plan and Conditional Use Permit approval shall expire within two (2)years from the effective date of approval if construction pursuant to this approval has not commenced within that time period, as required by Sections 17.46.080, 17.42.070 and 17.38.070 of the RHMC, or the approval granted is otherwise extended pursuant to the requirements of those sections. B. If any condition of this resolution is violated, the entitlement granted by this resolution shall be suspended and the privileges granted hereunder shall lapse and upon receipt of written notice from the City, all construction work being performed on the subject property shall immediately cease, other than work determined by the City Manager or his/her designee required to cure the violation. The suspension and stop work order will be lifted once the Applicant cures the violation to the satisfaction of the City Manager or his/her designee. In the event that the Applicant disputes the City Manager or his/her designee's determination that a violation exists or disputes how the violation must be cured, the Applicant may request a hearing before the City Council. The hearing shall be scheduled at the next regular meeting of the City Council for which the agenda has not yet been posted; the Applicant shall be provided written notice of the hearing. The stop work order shall remain in effect during the pendency of the hearing. The City Council shall make a determination as to whether a violation of this Resolution has occurred. If the Council determines that a violation has not occurred or has been cured by the time of the hearing, the Council will lift the suspension and the stop work order. If the Council determines that a violation has occurred and has not yet been cured, the Council shall provide the Applicant with a deadline to cure the violation; no construction work shall be performed on the property until and unless the violation is cured by the deadline, other than work designated by the Council to accomplish the 3 Resolution No.2019-18 cure. If the violation is not cured by the deadline, the Council may either extend the deadline at the Applicant's request or schedule a hearing for the revocation of the entitlements granted by this Resolution pursuant to Chapter 17.58 of the RHMC. C. All requirements of the Building and Construction Ordinance, the Zoning Ordinance, and of the zone in which the subject property is located must be complied with unless otherwise set forth in the Permit, or shown otherwise on an approved plan. D. Prior to submittal of final working drawings to Building and Safety Department for issuance of building permits, the plans for the project shall be submitted to City staff for verification that the final plans are in compliance with the plans approved by the Planning Commission. E. The lot shall be developed and maintained in substantial conformance with the site plan on file dated October 9, 2019 except as otherwise provided in these conditions. All conditions of the Site Plan Review and Conditional Use Permit approvals shall be incorporated into the building permit working drawings, and where applicable complied with prior to issuance of a grading or building permit from the building department. The conditions of approval of this Resolution shall be printed onto building plans submitted to the Building Department for review and shall be kept on site at all times. Any modifications and/or changes to the approved project, including resulting from field conditions,shall be discussed and approved by staff prior to implementing the changes. F. A licensed professional preparing construction plans for this project for Building Department review shall execute a Certificate affirming that the plans conform in all respects to this Resolution approving this project and all of the conditions set forth therein and the City's Building Code and Zoning Ordinance. Further, the person obtaining a building and/or grading permit for this project shall execute a Certificate of Construction stating that the project will be constructed according to this Resolution and any plans approved therewith. G. The structural net lot coverage shall not exceed 18,987 sq.ft. or 15.1% in conformance with the lot coverage limitations; the proposed total coverage, (structures and flatworks) shall not exceed 32,120 sq.ft. or 25.5%. The proposed residentil building pad will be 61,679 sq.ft. with 29.5% structural coverage-accounting for allowable deductions, and includes the guest house. H. The disturbed area of the lot shall not exceed 56.8% which is currently legal non-conforming. Grading for this project shall not exceed 50 cubic yards to be balanced on site. I. A driveway and a turn-around shall be provided per the Fire Department requirements. J. A minimum of five-foot path and/or walkway, which does not have to be paved, shall be provided around the entire perimeter of all of the proposed structures, or as otherwise required by the Fire Department. K. The highest ridgeline of the residence shall not exceed 18'-2" from the finished grade to the finished surface of the roof, highest point of the cupola at 19'-6"and chimney at 19'-2". The guest house may not exceed the height of 15'-5" and the chimney 16'-9" and the arbor 9'-3". 4 Resolution No.2019-18 L. The applicant shall comply with all requirements of the Lighting Ordinance of the City of Rolling Hills (RHMC 17.16.190) pertaining to lighting on said property and roofing material requirements of properties and all other ordinances and laws of the City of Rolling Hills. M. The guest house shall not exceed 799 square feet as measured from the outside wall. All provisions of Section 17.16.210(A)(5) of the zoning ordinance, shall be complied with; including, and not be limited to: only one sanitary facility consisting of a shower, sink, and a toilet and a kitchenette is permitted in the guest house; there shall be no parking area within 50-feet of the guest house and no renting of the guest house is permitted. A guest house floor plan shall be submitted to the Planning Department priort to obtaining a building permit. N. A grading and drainage plan,as required by the Building Department shall be prepared and approved by City Staff prior to issuance of a grading permit. Such plan shall be subject to LA County Code requirements. Hydrology, soils, geology and other reports, as required by the Building and Public Works Departments, and as may be required by the Building Official, shall be prepared. O. All graded slopes shall be landscaped. Prior to issuance of building permit, a detailed landscaping plan shall be submitted to the City in conformance with Fire Deparliiient Fuel Modification requirements and shall be subject to the requirements of the City's Water Efficient Landscape Ordinance, (Chapter 13.18 of the RHMC) and View Preservation (Chapter 17.26 of the RHMC). The landscaping plan shall include vegetation and trees, that when planted, to the maximum extent feasible, screen the development from the adjacent properties; minimum of 24 inch plant boxes and 15 gallon plants shall be utilized for screening. The detailed landscaping plan must provide that any trees and shrubs used in the landscaping scheme for this project shall be planted in a way that screens the development from adjacent street and neighbors, but as plants grow, they would not grow into a hedge or impede any neighbors views. The landscaping plan shall utilize to the maximum extent feasible, plants that are native to the area, are water-wise and are consistent with the rural character of the community. The project shall be continually maintained in substantial conformance with the landscaping plan. P. All utility lines to all structures on the lot shall be placed underground, subject to all applicable standards and requirements. Q. Hydrology, soils, geology and other reports, as required by the Building and Public Works Departments,and as may be required by the Building Official, shall be prepared. R. A construction fence may be allowed or may be required by the City or the Building Department staff for the duration of the construction of the project. City staff shall approve the location and height of the fence. The construction fence shall not be placed more than 15 calendar days prior to commencement of the construction and shall be removed within 15 calendar days of substantial completion of the project as determined by City staff or at any given time at the discretion of City staff. S. Placement of one construction and one office trailer may be permitted for the duration of on-site construction activities during an active building permit; each shall be no larger than 8' x 40' in size, and must be authorized by City staff with such authorization being revoked at any point deemed reasonable by City staff. Such trailers, to maximum extent practicable shall be located in a manner not visible from the street. Unless otherwise approved by staff, with proof of a good cause, such trailers shall not be located in any setback or front yard,may be placed on the site no more than 15 calendar 5 Resolution No.2019-18 days prior to commencement of construction and must be removed within 15 calendar days ot xpiiiion of a building permit., revocation, or tinali7ation(4 the pioject, T. Minimum of 65% of any construction materials must be recycled or diverted from landfills. The hauler of the materials shall obtain City's Construction and Demolition permits for waste hauling prior to start of work and provide proper documentation to the City upon completion of the project. U. During construction, conformance with the Air Quality Management District requirements, stormwater pollution prevention practices, county and local ordinances and engineering practices so that people or property are not exposed to undue vehicle trips, noise, dust, and objectionable odors shall be required. V. During construction, to the extent feasible, all parking shall take place on the project site, but if necessary, any overflow parking may take place within the unimproved roadway easements along adjacent streets, and shall not obstruct neighboring driveways, visibility at intersections or pedestrian and equestrian passage. During construction, to the maximum extent feasible, employees of the contractor shall car-pool into the City. To the extent feasible, a minimum of 4' wide path, from the edge of the roadway pavement, for pedestrian and equestrian passage shall be available and be clear of vehicles, construction materials and equipment at all times. A flagmen shall be used to direct traffic when necessary, including during delivery of large construction equipment or materials. W. During construction,the property owners shall be required to schedule and regulate construction and related traffic noise throughout the day between the hours of 7 AM and 6 PM, Monday through Saturday only, when construction and mechanical equipment noise is permitted,so as not to interfere with the quiet residential environment of the City of Rolling Hills. Construction work is prohibited during federal holidays. X. The contractor shall not use tools that could produce a spark, including for clearing and grubbing, during red flag warning conditions. Weather conditions can be found at: httpwww.wrh.noaa.goviloximain.php?suite=safety&page=hazard_definitions#FIR E.It is the sole responsibility of the property owner and/or his/her contractor to monitor the red flag warning conditions. Should a red flag warning be declared and if work is to be conducted on the property, the contractor shall have readily available fire distinguisher. Y. The property owners shall be required to conform with the Regional Water Quality Control Board and County Public Works Department Best Management Practices (BMP's)requirements related to solid waste,drainage,cisterns,and storm water drainage facilities,management and to the City's Low Impact development Ordinance (LID). Further the property owners shall be required to conform to the County Health Department requirements for a septic system. Z. Prior to finaling of the project an "as graded" and "as constructed" plans and certifications, including certifications of ridgelines of the structures, shall be provided to the Planning Department and the Building Department to ascertain that the completed project is in compliance with the approved plans. In addition, any modifications made to the project during construction, shall be depicted on the "as built/as graded" plan. AA. The Applicant shall execute an Affidavit of Acceptance of all conditions of this permit pursuant to Zoning Ordinance, or the approval shall not be effective. The affidavit shall be recorded together with the resolution. 6 Resolution No.2019-18 PASSED, APPROVE ND',ADO)TED THIS 9th DAY OF DECEMBER, 2019, B\AD CHELF, CHAIRMAN ATTEST: CITY CLER 1 Any action challenging the final decision of the City made as a result of the public hearing on this application must be filed within the time limits set forth in Section 17.54.070 of the Rolling Hills Municipal Code and Code of Civil Procedure Section 1094.6. 7 Resolution No.2019-18 STATE OF CALIFORNIA COUNTY OF LOS ANGELES ) §§ CITY OF ROLLING HILLS I certify that the foregoing Resolution No. 2019-18 entitled: A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROLLING HILLS GRANTING APPROVAL FOR A SITE PLAN REVIEW FOR THE CONSTRUCTION OF A 1,789 SQUARE FOOT HOUSE ADDITION AND 324 SQUARE FOOT GARAGE ADDITION, AND TO ATTACH AN EXISTING 978 SQUARE FOOT GUEST HOUSE TO THE RESIDENCE FOR A TOTAL OF 7,519 SQUARE FOOT RESIDENCE AND 1,030 SQUARE FOOT GARAGE AND GRADING OF 50 CUBIC YARDS OF DIRT; AND A CONDITIONAL USE PERMIT (CUP) TO CONSTRUCT A 799 SQUARE FOOT GUEST HOUSE IN ZONING CASE NO, 960 AT 13 EASTFIELD DRIVE (BIRKETT). was approved and adopted at a regular meeting of the Planning Commission on December 9, 2019 by the following roll call vote: AYES: CARDENAS, COOLEY,KI ATRICK,SEABURN, AND CHAIRMAN CHELF NOES: NONE. ABSENT: NONE. ABSTAIN: NONE and in compliance with the laws of California was posted at the following: Administrative Offices CITY CLER 8 Resolution No.2019-18